Choose an industry to define the assessment boundary, evidence requirements and technical review.
No sector benchmark, standard saving, cost or payback is assigned in this directory.
Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.
Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.