Two routes to the same tonne of CO2 — at very different cost, speed and risk. The honest sequencing answer is usually «cheaper one first, it funds the other».
| Removable insulation (modular) | Hydrogen fuel switch | |
|---|---|---|
| Abatement cost | saves money | €80–150/t |
| Addresses | 2–5% | up to 100% of fuel CO2 |
| Payback | 0.5–2 yr | >8 yr today |
| Best for |
Verdict: start with Removable insulation (modular) — lower €/t and faster payback; bank its savings toward the structural step. Sequencing beats either/or: every tonne the cheap measure removes shrinks the expensive one's required size.
Full page: Removable insulation (modular) → · Full page: Hydrogen fuel switch →
Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets: