| # | Plant | Region | MW |
|---|---|---|---|
| 1 | Ribatejo | Lisbon | 1,176 |
| 2 | Tapada do Outeiro | Porto | 990 |
| 3 | Pego C.C. | Santarem | 836 |
| 4 | Lares | Coimbra | 826 |
| 5 | Sines Refinery power station | Lisbon | 91 |
| 6 | Matosinhos Refinery power station | Matosinhos | 82 |
| 7 | Setubal Mill power station | Aveiro | 80 |
| 8 | Viana Mill power station | Viana de Castelo | 71 |
| 9 | Figueira da Foz Industrial Complex power station | Coimbra | 67 |
| 10 | Sines Polimeros power station | Setubal | 43 |
| 11 | Indorama Sines power station | Setubal | 41 |
| 12 | Carrico Refinery power station | Leiria | 32 |
| 13 | Fisigen power station | Setubal | 24 |
WRI Global Power Plant Database (CC BY 4.0).
Lifecycle and source reconciliation
This page contains 13 positive-capacity records totalling 4,359 MW. Lifecycle labels, capacity scope and capacity-quality provenance are kept separate so a source-backed capacity is not mistaken for a verified operating status.
12records with a resolvable source link
1records without a retained record-level link
Lifecycle labels in this page slice
| Status | Records |
|---|---|
| Not Reported | 1 |
| Operating | 12 |
Capacity provenance quality
| Quality label | Records |
|---|---|
| current source verified gem operating units 2026 | 1 |
| legacy source record not current verified | 1 |
| source verified gem tracker location 2026 | 10 |
| source verified wikidata p2109 strict match | 1 |
Unknown upstream labels remain unclassified; they are never guessed. Download the exact records used here: CSV · JSON with limitations.
