Facts and rankings from the PowerAtlas open dataset: nuclear build speed, the combined-cycle / HRSG fleet, the construction pipeline and more.
Average years from construction start to grid connection (countries with 4+ reactors on record).
| Country | Avg build time | Sample |
|---|---|---|
| 1. Japan | 4.1 yr | 16 reactors |
| 2. Italy | 5.2 yr | 4 reactors |
| 3. Ukraine | 5.8 yr | 4 reactors |
| 4. Canada | 6.0 yr | 6 reactors |
| 5. Sweden | 6.0 yr | 4 reactors |
| 6. France | 6.1 yr | 21 reactors |
| 7. South Korea | 6.2 yr | 6 reactors |
| 8. China | 6.4 yr | 15 reactors |
| Reactor | Country | Model | Build time |
|---|---|---|---|
| Marcoule nuclear power plant | France | unknown | 1 yr |
| Vallecitos nuclear power plant | United States of America | unknown | 1 yr |
| Big Rock Point nuclear power plant | United States of America | unknown | 2 yr |
| SM-1 nuclear power plant | United States of America | unknown | 2 yr |
| Hamaoka | Japan | BWR-4 | 3 yr |
| Onagawa | Japan | BWR-5 | 3 yr |
| Shimane | Japan | BWR-3 | 3 yr |
| Tomari | Japan | M (2-loop) | 3 yr |
| Tsuruga | Japan | Mitsubishi advanced pressurized water reactor (APWR) | 3 yr |
| Kola NPP | Russia | VVER 600 | 3 yr |
| Reactor type | Units |
|---|---|
| Pressurized Water Reactor | 260 |
| Boiling Water Reactor | 90 |
| Unknown | 54 |
| Pressurized Heavy Water Reactor | 25 |
| Small Modular Reactor | 24 |
| Gas-Cooled Reactor | 22 |
| Fast Breeder Reactor | 11 |
| High Temperature Gas Reactor | 10 |
2,237 operating combined-cycle (HRSG-bearing) plants worldwide; 404 under construction or planned. Explore the full set in the HRSG / combined-cycle map.
| Country | Operating CCGT plants |
|---|---|
| 1. United States of America | 500 |
| 2. China | 244 |
| 3. Italy | 82 |
| 4. Russia | 82 |
| 5. Mexico | 80 |
| 6. Germany | 79 |
| 7. India | 67 |
| 8. Spain | 62 |
| 9. Iran | 61 |
| 10. South Korea | 54 |
Power plants currently under construction or in pre-construction, by fuel.
| Fuel | Plants in the pipeline |
|---|---|
| Gas | 497 |
| Wind | 135 |
| Coal | 106 |
| Nuclear | 49 |
| Hydro | 48 |
| Oil | 35 |
| Solar | 32 |
| Other | 1 |
| Biomass | 1 |
Japan has the fastest average reactor construction time at about 4.1 years (from construction start to grid connection, across 16 reactors).
The most common reactor type is the pressurized water reactor (260 units in the dataset).
About 2,237 combined-cycle gas plants are operating, each carrying one or more heat-recovery steam generators (HRSGs); a further 404 are under construction or planned.
Of coal units with combustion data, about 24% use supercritical or ultra-supercritical technology (1,037 of 4,253).