Ribatejo is a 1,176 MW gas power station in Lisbon, Portugal. It is operated by EDP SA [100%]. Based on reported annual generation of 2,577 GWh, it can supply roughly 736k homes. It ranks #2 of 480 Portugal power plants by installed capacity. Commissioned in 2005, it is around 21 years old — relatively modern. Its annual emissions of 230,826 t CO₂/yr (EU ETS verified (EUTL 2023)) are equivalent to about 54k cars driven for a year. In context, gas supplies about 16.4% of Portugal's electricity; the national grid averages 128 gCO₂/kWh (81.0% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1023228.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM tracker 2026 (location L100000400589); fuel: WRI source-record fuel
At 1,176 MW, Ribatejo is well above the median gas plant in Portugal (80 MW). Technically it is described as CCGT; combined-cycle with a heat-recovery steam generator (HRSG); Siemens Energy: V94.3A. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
This facility's annual emissions are roughly equivalent to:
Equivalencies via US EPA Greenhouse Gas Equivalencies; emissions per EU ETS verified (EUTL 2023) (measured for US EPA/EU ETS, modelled for Climate TRACE).
Annual generation (GWh), WRI Global Power Plant Database (CC BY 4.0).
Operated by EDP SA [100%].
This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a hot-summer Mediterranean climate (Köppen Csa) — Northern Hemisphere, latitude 39.0°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 63% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 25/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.
A gas turbine here also runs ~1% below its ISO (15°C) rating at this annual mean (typical CCGT curve, estimate).
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with marine corrosion the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #1 largest gas power plant of 13 in Portugal by capacity.
Portugal has 13 gas power plants in this dataset, together about 4,359 MW of capacity.
Coordinates 39.0118, -8.9521 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Ribatejo is a 1,176 MW source-record gas power plant in Lisbon, Portugal, commissioned in 2005.
Ribatejo generates about 2,577 GWh of electricity per year.
Its output is enough to supply roughly 736,371 homes.
Ribatejo is operated by EDP SA [100%].
Ribatejo has measured emissions of about 230,826 tonnes of CO₂ per year (EU ETS verified (EUTL 2023)).