年間£5M超の英国中央政府調達(PPN 06/21、2025年の制度にPPN 006として引き継がれた)。多くの地方自治体、NHS機関、元請業者が、しきい値未満でも任意で適用します。
From our guide: 英国入札のためのCarbon Reduction Plans(PPN 06/21 → PPN 006) — full context, charts and sources there.
Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:
Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.