Oil & gas production in Colombia: emitters, CO2 & carbon value

12 tracked facilities, ≈37,065,410 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing oil & gas production.

The numbers

Oil & gas production in Colombia at a glance

MetricValueNote
Facilities tracked12with CO2 estimates
Total est. CO237,065,410 t/yrClimate TRACE 2023
Average per facility3,088,784 t/yr
Indicative carbon value€2,869M/yrat €77.4/t EUA

Carbon pricing here: Carbon tax ≈US$5/t with offset crediting (World Bank State & Trends of Carbon Pricing 2025 / ICAP 2025). Current benchmark: no liquid market price. Full country page: carbon price in Colombia.

Largest emitters

Top 10 oil & gas production CO2 emitters in Colombia

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Colombia_Llanos_Heavy oilEcopetrol SA26,503,794€2,051.4M
2Colombia_Llanos_Conventional onshoreEcopetrol SA5,076,955€393.0M
3Colombia_Middle Magdalena Valley_Heavy oil1,491,742€115.5M
4Colombia_Oriente_Conventional onshoreEcopetrol SA1,437,476€111.3M
5Colombia_Middle Magdalena Valley_Conventional onshoreOccidental Petroleum Corp1,311,649€101.5M
6Colombia_Lower Magdalena_Conventional onshoreCanacol Energy Ltd476,562€36.9M
7Colombia_Upper Magdalena Valley_Conventional onshore432,640€33.5M
8Colombia_Guajira_Conventional shelf186,390€14.4M
9Colombia_Sinu_Conventional onshore75,285€5.8M
10Colombia_Maracaibo_Conventional onshore37,943€2.9M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 90% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access than fixed cut-and-weld lagging — unclips and refits in minutes, no destruction
  • Inspectable — comes off to check for corrosion under insulation, then refits like-new (generic jackets often don't survive removal)
  • Typical payback under 2 years (some 9–11 months)
Same industry, other countries
Other industries in Colombia
FAQ

Questions

How many oil & gas production facilities does Colombia have with tracked emissions?
12 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈37,065,410 t CO2/yr.
What is the largest oil & gas production emitter in Colombia?
Colombia_Llanos_Heavy oil — ≈26,503,794 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the EU price?
≈€2,869M per year at €77.4/t — indicative full-price value; actual cost depends on free allocation and the local instrument.
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex — manufacturer of modular removable insulation (UK Patent GB2508992.1). Spotted an error? Tell us — we correct on evidence.
Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.