| # | Plant | Region | MW |
|---|---|---|---|
| 1 | TPP CCCC Petrom Brazi | Prahova | 920 |
| 2 | TPP Iernut | Mures | 751 |
| 3 | Hefaistos power station | Mures | 500 |
| 4 | Bucharest-Vest power station | Bucuresti | 436 |
| 5 | TPP Braila | Braila | 413 |
| 6 | TPP Galati | Galati | 375 |
| 7 | TPP Bucuresti Vest | Ilfov | 298 |
| 8 | Craiova II power station | Craiova | 295 |
| 9 | TPP Bucuresti Sud | Ilfov | 280 |
| 10 | Palas power station | Constanta | 255 |
| 11 | Ciech Soda power station | Valcea | 230 |
| 12 | TPP Brazi | Prahova | 220 |
| 13 | TPP Progresu | Ilfov | 200 |
| 14 | ClusterPower Craiova power station | Craiova | 200 |
| 15 | Borzesti power station | Bacau | 189 |
| 16 | Câmpia Turzii power station | Cluj County | 150 |
| 17 | Romag Termo power station | Mehedinti | 150 |
| 18 | Chimcomplex power station | Valcea | 108 |
| 19 | Petromidia Refinery power station | Constanta | 80 |
| 20 | Oradea power station | Bihor | 76 |
| 21 | Ploesti power station | Prahova | 61 |
| 22 | Bucharest-Titan power station | Bucuresti | 50 |
| 23 | Iasi-1 power station | Iasi | 50 |
| 24 | CET Arad hydrocarbons power station | Arad County | 30 |
| 25 | Arad power station | Arad | 21 |
| 26 | Premier Energy Braila power station | Brăila County | 20 |
WRI Global Power Plant Database (CC BY 4.0).
This page contains 26 positive-capacity records totalling 6,357.8 MW. Lifecycle labels, capacity scope and capacity-quality provenance are kept separate so a source-backed capacity is not mistaken for a verified operating status.
| Status | Records |
|---|---|
| Announced | 2 |
| Construction | 3 |
| Mothballed | 1 |
| Not Reported | 4 |
| Operating | 14 |
| Unclassified | 2 |
| Quality label | Records |
|---|---|
| legacy source record not current verified | 18 |
| source verified gem tracker location 2026 | 8 |
Unknown upstream labels remain unclassified; they are never guessed. Download the exact records used here: CSV · JSON with limitations.