Hydro power plant in Mendoza, Argentina. Approximate location -34.61, -68.6136.
HydroMendozaArgentina
EL TIGRE is a 14 MW hydro power plant in Mendoza, Argentina. It is operated by HIDISA. Based on its capacity (estimated), it can supply roughly 14k homes (estimated). It ranks #199 of 275 Argentina power plants by installed capacity. Commissioned in 1989, it is around 37 years old — long-established. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, hydro supplies about 17.1% of Argentina's electricity; the national grid averages 346 gCO₂/kWh (41.6% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id ARG0000211.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.
capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel
At 14 MW, EL TIGRE is below the median hydro plant in Argentina (42 MW). Hydropower converts the energy of falling or flowing water into electricity; output depends on rainfall and reservoir level, and large dams also provide grid balancing and storage.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by HIDISA.
This hydro plant converts the energy of falling or flowing water through hydro turbines. It sits in a cold semi-arid steppe climate (Köppen BSk) — Southern Hemisphere, latitude 34.6°S — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 13% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 45/100 — this site sits in the mid third of the power plants we cover by heating degree-days.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #36 largest hydro power plant of 50 in Argentina by capacity.
Argentina has 50 hydro power plants in this dataset, together about 9,991 MW of capacity.
Coordinates -34.61, -68.6136 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
EL TIGRE is a 14 MW source-record hydro power plant in Mendoza, Argentina, commissioned in 1989.
Its output is enough to supply roughly 14,416 homes (estimated).
EL TIGRE is operated by HIDISA.