Home / Europe / Poland / EC GIGA

EC GIGA

Coal power plant in Lublin Voivodeship, Poland. Approximate location 51.2258, 22.7079.

CoalLublin VoivodeshipPolandCO₂ measured

EC GIGA is a 6 MW coal power plant in Lublin Voivodeship, Poland. It is operated by Veolia Wschód. Based on its capacity (estimated), it can supply roughly 7.5k homes (estimated). It ranks #215 of 246 Poland power plants by installed capacity. Commissioned in 1950, it is around 76 years old — an older, legacy facility. Its annual emissions of 67,770 t CO₂/yr (EU ETS verified (EUTL 2023)) are equivalent to about 16k cars driven for a year. In context, coal supplies about 50.4% of Poland's electricity; the national grid averages 589 gCO₂/kWh (31.5% low-carbon) (2025).

6Legacy source-record capacity
7,508homes powered (est.)
67,770t CO₂ / yr (EU ETS verified (EUTL 2023))
1950commissioned (~76 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1061502.

Data status

Known data

FacilityEC GIGA WRI
CountryPoland · Lublin Voivodeship WRI
Coordinates51.2258, 22.7079 WRI
FuelCoal WRI
MW installed capacity6 MW WRI source record; scope not independently normalised
OwnerVeolia Wschód WRI
Commissioned1950 WRI
CO₂ emissions67,770 t CO₂/yr measured · EU ETS verified (EUTL 2023)

Calculated from dataset

Capacity rank in country#215 of 246 calculated
Fuel-specific rank in country#91 of 93 calculated
Capacity vs country/fuel peers0.04× · 166 MW median · 93 peers calculated
Homes-powered equivalent7,508 calculated
Climate7.5°C · HDD 3,808 derived from coordinates
Environmental severityC2 · 26/100 derived from coordinates

Not available

TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.

capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel

In context: how this plant compares

At 6 MW, EC GIGA is below the median coal plant in Poland (166 MW). Coal plants burn pulverised coal to raise high-pressure steam for a turbine; they run as baseload but are the most carbon-intensive mainstream source and the first targeted for retirement or efficiency retrofits.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

67,770 t CO₂/yr — in everyday terms

This facility's annual emissions are roughly equivalent to:

16kpassenger cars driven for a year
8.8khomes' yearly energy use
1.1 milliontree seedlings grown 10 years to absorb it

Equivalencies via US EPA Greenhouse Gas Equivalencies; emissions per EU ETS verified (EUTL 2023) (measured for US EPA/EU ETS, modelled for Climate TRACE).

Capacity vs largest coal plants in Poland

Bełchatów: 5,030 MW5kBełchatówKozienice: 3,994 MW4kKozieniceKozienice: 2,673 MW3kKozieniceTurów: 1,948 MW2kTurówDolna Odra: 1,830 MW2kDolna OdraRybnik: 1,720 MW2kRybnikOpalenie power station: 1,660 MW2kOpalenie p…Połaniec: 1,657 MW2kPołaniec

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Veolia Wschód.

Local climate & thermal context

This coal plant burns coal to raise high-pressure steam that spins a turbine-generator. It sits in a warm-summer humid continental climate (Köppen Dfb) — Northern Hemisphere, latitude 51.2°N — which shapes how much energy it can produce and how its output varies through the year.

7.5°Cannual mean temp
3,808heating degree-days (base 18°C)
0cooling degree-days (base 18°C)
232 melevation

Monthly mean temperature

J: -4 °CJF: -3 °CFM: 2 °CMA: 8 °CAM: 13 °CMJ: 16 °CJJ: 18 °CJA: 17 °CAS: 13 °CSO: 8 °CON: 2 °CND: -2 °CD18 °C

Heating degree-days here run 55% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 82/100 — this site sits in the top third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.

C2ISO 9223 corrosivity (indicative)
26/100environmental-severity index
21.6°Cseasonal temperature swing
408 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #91 largest coal power plant of 93 in Poland by capacity.

Poland has 93 coal power plants in this dataset, together about 47,959 MW of capacity.

Nearby power plants

Location

Coordinates 51.2258, 22.7079 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is EC GIGA?

EC GIGA is a 6 MW source-record coal power plant in Lublin Voivodeship, Poland, commissioned in 1950.

How many homes can EC GIGA power?

Its output is enough to supply roughly 7,508 homes (estimated).

Who operates EC GIGA?

EC GIGA is operated by Veolia Wschód.

How much CO₂ does EC GIGA emit?

EC GIGA has measured emissions of about 67,770 tonnes of CO₂ per year (EU ETS verified (EUTL 2023)).

Built from open public data; no personal information. Operate this site? Request a correction or removal.