Power-plant project records in Eswatini
Six source records for cancelled, shelved or pre-permit projects. Their proposed capacities are not installed generating capacity.
Project records
| Project | Source status | Fuel | Proposed MW | Source |
|---|---|---|---|---|
| Edwaleni power station | Shelved | Gas | 250 | GEM |
| KEPCO Eswatini power station | Cancelled | Coal | 200 | GEM |
| Lubhuku power station | Pre-permit | Coal | 300 | GEM |
| Maswati power station | Cancelled | Coal | 1,000 | GEM |
| Mpaka power station | Cancelled | Coal | 500 | GEM |
| Swazi Coal power station | Cancelled | Coal | 400 | GEM |
Operating generation
This snapshot does not contain the operating national fleet. It must not be used to calculate Eswatini’s installed capacity or fuel mix. The Eswatini Electricity Company publishes information about its hydro and solar stations.
The 250 MW Edwaleni gas proposal is a different project from the operating Edwaleni hydro station.