Compare measures using the same site boundary and decision period. Do not rank them with generic saving or payback ranges.
Record energy use, production, operating schedule, constraints, maintenance condition and the reporting boundary.
Consider heat-loss reduction, controls, maintenance, heat recovery, electrification and supply changes only where the process evidence supports them.
Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.
Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.
Record energy effect, capital and operating costs, dependencies, delivery risk, carbon factor and verification plan.
Keep assumptions, source dates, approvals, rejected options and the conditions that would change the result.
No measure is assigned a standard saving, cost, payback or priority on this page.