Inzonex
Modelled facility data · 2023

Largest iron and steel facility estimates in this dataset

The order is based on Climate TRACE modelled estimates for 2023 after repeated placeholder values are removed.

Download the tableRead the methodology
01

Data status

This is a ranking within the stated modelled dataset. It is not a verified emissions league table, a current inventory or a liability ranking.

02

Largest estimates in this dataset

RankFacilityCountryModelled sectorEstimated t CO2, 2023
1POSCO Gwangyang steel plantSouth Koreairon-and-steel34,799,208
2Angang Steel Co LtdChinairon-and-steel31,049,504
3Wuhan Iron and Steel Co LtdChinairon-and-steel25,916,033
4Maanshan Iron and Steel Co LtdChinairon-and-steel25,389,837
5Inner Mongolia BaoTou Steel Union Co LtdChinairon-and-steel25,167,415
6POSCO Pohang steel plantSouth Koreairon-and-steel24,457,044
7Baoshan Iron and Steel Co Ltd HeadquartersChinairon-and-steel23,974,641
8Zhangjiagang Hongchang Steel Co LtdChinairon-and-steel21,886,764
9Shougang Jingtang United Iron and Steel Co LtdChinairon-and-steel21,766,330
10NLMK Lipetsk steel plantRussian Federationiron-and-steel20,558,330
11Hyundai Steel Dangjin steel plantSouth Koreairon-and-steel20,049,392
12Rizhao Steel Holding Group Co LtdChinairon-and-steel19,273,891
13JFE West Japan Works (Fukuyama) steel plantJapaniron-and-steel19,085,123
14Bengang Steel Plates Co LtdChinairon-and-steel18,600,996
15ThyssenKrupp Steel Duisburg steel plantGermanyiron-and-steel17,975,297
16Magnitogorsk Iron and Steel WorksRussian Federationiron-and-steel17,594,774
17Tata Steel Jamshedpur steel plantIndiairon-and-steel16,653,502
18Xinyu Iron and Steel Group Co LtdChinairon-and-steel16,560,215
19Severstal Cherepovets steel plantRussian Federationiron-and-steel16,537,222
20JSW Steel Vijayanagar steel plantIndiairon-and-steel15,936,581

Download this table as CSV

Inzonex removable modular insulation on industrial equipment
Equipment heat loss

Measure exposed hot surfaces

Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.

  • Design target: surface temperature at or below 45 °C, subject to the application and design review
  • Claimed heat-loss reduction: up to 96%, subject to the measured boundary and insulation specification
  • Removable construction for inspection and maintenance access
  • Calculation record available for the selected equipment and operating conditions

Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.

Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.