Inzonex Carbon Hubpowered by inzonex.co.uk
Question

企業はどうやってScope 1排出を削減できるか?(例)

Answer

Scope 1はサイト内燃焼であり、レバーは燃料側です: 定常熱損失をなくす(裸のコンポーネント — 燃料の2〜5%、最速の回収)、スチームトラップを修理する、燃焼を調整する、煙道ガスの熱を回収する、復水を回収する、その後に構造的に: ヒートポンプ、電化、燃料転換。節約された燃料の1%ごとが、Scope 1の1%減です — 直接的に、検証可能に、ガスメーターに照らして。

From our guide: Scope 1削減 — full context, charts and sources there.

Related questions

People also ask

How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex — manufacturer of modular removable insulation (UK Patent GB2508992.1). Spotted an error? Tell us — we correct on evidence.
Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access than fixed cut-and-weld lagging — unclips and refits in minutes, no destruction
  • Inspectable — comes off to check for corrosion under insulation, then refits like-new (generic jackets often don't survive removal)
  • Typical payback up to 2 years

Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.

Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.