Les marchés publics du gouvernement central britannique au-dessus de £5M/an (PPN 06/21, repris dans le régime 2025 en tant que PPN 006). De nombreuses autorités locales, organismes NHS et entrepreneurs principaux l'appliquent volontairement en dessous du seuil.
From our guide: Plans de réduction du carbone pour les appels d'offres britanniques (PPN 06/21 → PPN 006) — full context, charts and sources there.
Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:
Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.