Appalti del governo centrale del Regno Unito superiori a £5M/anno (PPN 06/21, portati nel regime 2025 come PPN 006). Molte autorità locali, corpi NHS e appaltatori principali lo applicano volontariamente al di sotto della soglia.
From our guide: Piani di Riduzione del Carbonio per Appalti UK (PPN 06/21 → PPN 006) — full context, charts and sources there.
Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:
Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.