Inzonex Carbon Hubpowered by inzonex.co.uk
Carbon HubCountry × industry → Yemen · Cement
Data layer · est. 2023

Cement in Yemen: emitters, CO2 & carbon value

6 tracked facilities, ≈2,828,980 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing cement.

The numbers

Cement in Yemen at a glance

MetricValueNote
Facilities tracked6with CO2 estimates
Total est. CO22,828,980 t/yrClimate TRACE 2023
Average per facility471,497 t/yr
Indicative carbon value€213M/yrat €75.36/t CBAM
📦 Cement is a CBAM sector. EU-bound exports from Yemen pay the border price on the 2026→2034 phase-in — how CBAM works.

No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.

Largest emitters

Top 6 cement CO2 emitters in Yemen

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Musaymir Cement PlantNational Cement Co885,955€66.8M
2Amran Cement PlantYemen General Corporation for Cement Industry and Marketing788,259€59.4M
3Abdullah Gharib Cement PlantArabian Yemen Cement Co Ltd610,320€46.0M
4Bajil Cement PlantYemen General Corporation for Cement Industry and Marketing207,074€15.6M
5Asmad Rashid Cement PlantYemen General Corporation for Cement Industry and Marketing200,466€15.1M
6Ba Tays Cement PlantUnity Cement Company Ltd136,906€10.3M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access than fixed cut-and-weld lagging — unclips and refits in minutes, no destruction
  • Inspectable — comes off to check for corrosion under insulation, then refits like-new (generic jackets often don't survive removal)
  • Typical payback up to 2 years

Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.

Same industry, other countries
FAQ

Questions

How many cement facilities does Yemen have with tracked emissions?
6 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈2,828,980 t CO2/yr.
What is the largest cement emitter in Yemen?
Musaymir Cement Plant — ≈885,955 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the CBAM price?
≈€213M per year at €75.36/t — indicative full-price value; actual cost depends on the EU-bound export share.
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex — manufacturer of modular removable insulation (UK Patent GB2508992.1). Spotted an error? Tell us — we correct on evidence.
Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.