Cement in United Kingdom: emitters, CO2 & carbon value

10 tracked facilities, ≈3,661,096 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing cement.

The numbers

Cement in United Kingdom at a glance

MetricValueNote
Facilities tracked10with CO2 estimates
Total est. CO23,661,096 t/yrClimate TRACE 2023
Average per facility366,110 t/yr
Gross value (full price)€276M/yrall tracked CO2 × €75.36/t CBAM ref — before free allocation / EU-bound share

Carbon pricing here: Carbon Price Support adds £18/t for power generators on top of UK ETS. Current benchmark: £55.0/t (mid-2025 level). Full country page: carbon price in United Kingdom.

Largest emitters

Top 10 cement CO2 emitters in United Kingdom

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Hope Cement PlantBreedon Group PLC717,958€54.1M
2Ribblesdale Cement PlantHeidelberg Materials UK Ltd577,802€43.5M
3Rugby Cement PlantCEMEX UK Cement Ltd456,610€34.4M
4Cauldon Cement PlantAggregate Industries Ltd389,550€29.4M
5Tunstead Cement PlantTarmac Holdings Ltd373,349€28.1M
6Padeswood Cement PlantHeidelberg Materials UK Ltd252,804€19.1M
7Aberthaw Cement PlantTarmac Holdings Ltd239,632€18.1M
8Dunbar Cement PlantTarmac Holdings Ltd231,906€17.5M
9Ketton Cement PlantHeidelberg Materials UK Ltd225,641€17.0M
10Cookstown Cement PlantCookstown Cement Ltd195,844€14.8M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes Inzonex Modular Insulation — snap-fastened modules engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access vs standard insulation jackets and metal cladding/boxes — unclips and refits in minutes, no destruction
  • Inspectable — opens for corrosion-under-insulation checks, then refits like-new (generic jackets often don't survive removal)
  • Typical payback under 2 years — some sites 9–11 months

Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.

Same industry, other countries
Other industries in United Kingdom
FAQ

Questions

How many cement facilities does United Kingdom have with tracked emissions?
10 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈3,661,096 t CO2/yr.
What is the largest cement emitter in United Kingdom?
Hope Cement Plant — ≈717,958 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the CBAM price?
The gross full-price value is ≈€276M/yr (all tracked CO2 × €75.36/t CBAM ref). Actual CBAM liability is far smaller: it falls only on emissions embedded in EU-bound exports, and only on the phased-in share — 2.5% in 2026 rising to 100% by 2034 (Reg (EU) 2023/956).
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex Research. Spotted an error? Tell us — we correct on evidence.