The dataset contains 10 records after repeated placeholder values are removed. The estimated total is 3,661,096 tonnes of carbon dioxide for 2023.
These are Climate TRACE modelled estimates for 2023. They are not verified declarations, current emissions, tax liabilities or CBAM liabilities.
Some records may represent facility clusters. Confirm the facility, operator, installation boundary, sector and reporting period before use.
| Rank | Facility | Modelled sector | Estimated t CO2, 2023 |
|---|---|---|---|
| 1 | Hope Cement Plant | cement | 717,958 |
| 2 | Ribblesdale Cement Plant | cement | 577,802 |
| 3 | Rugby Cement Plant | cement | 456,610 |
| 4 | Cauldon Cement Plant | cement | 389,550 |
| 5 | Tunstead Cement Plant | cement | 373,349 |
| 6 | Padeswood Cement Plant | cement | 252,804 |
| 7 | Aberthaw Cement Plant | cement | 239,632 |
| 8 | Dunbar Cement Plant | cement | 231,906 |
| 9 | Ketton Cement Plant | cement | 225,641 |
| 10 | Cookstown Cement Plant | cement | 195,844 |
Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.
Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.
Country data for United Kingdom · Industry assessment for cement