Cement in Ukraine: emitters, CO2 & carbon value

8 tracked facilities, ≈4,525,126 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing cement.

The numbers

Cement in Ukraine at a glance

MetricValueNote
Facilities tracked8with CO2 estimates
Total est. CO24,525,126 t/yrClimate TRACE 2023
Average per facility565,641 t/yr
Gross value (full price)€341M/yrall tracked CO2 × €75.36/t CBAM ref — before free allocation / EU-bound share

Carbon pricing here: CO2 tax ₴30/t (≈€0.7) — symbolic; ETS planned as part of EU accession path. Current benchmark: no liquid market price. Full country page: carbon price in Ukraine.

Largest emitters

Top 8 cement CO2 emitters in Ukraine

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Ivano-Frankivskcement Cement PlantIvano-Frankivskcement PJSC1,097,321€82.7M
2Dyckerhoff Volyn-Cement PlantDyckerhoff Cement Ukraine PrAT997,725€75.2M
3Amvrosiyivka Cement PlantPik-Cement LLC791,967€59.7M
4Dyckerhoff Yugcement Cement PlantDyckerhoff Cement Ukraine PrAT541,093€40.8M
5Kryvyi Rih Cement PlantKryvyi Rih Cement PrJSC493,617€37.2M
6Podilskyi Cement PlantPodilsky Cement JSC275,202€20.7M
7Kamyansky Cement PlantKryvyi Rih Cement PrJSC190,869€14.4M
8Bakhchisarai Stroyindustria Cement PlantBakhchisaray Cement JSC137,332€10.3M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes Inzonex Modular Insulation — snap-fastened modules engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access vs standard insulation jackets and metal cladding/boxes — unclips and refits in minutes, no destruction
  • Inspectable — opens for corrosion-under-insulation checks, then refits like-new (generic jackets often don't survive removal)
  • Typical payback under 2 years — some sites 9–11 months

Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.

Same industry, other countries
Other industries in Ukraine
FAQ

Questions

How many cement facilities does Ukraine have with tracked emissions?
8 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈4,525,126 t CO2/yr.
What is the largest cement emitter in Ukraine?
Ivano-Frankivskcement Cement Plant — ≈1,097,321 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the CBAM price?
The gross full-price value is ≈€341M/yr (all tracked CO2 × €75.36/t CBAM ref). Actual CBAM liability is far smaller: it falls only on emissions embedded in EU-bound exports, and only on the phased-in share — 2.5% in 2026 rising to 100% by 2034 (Reg (EU) 2023/956).
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex Research. Spotted an error? Tell us — we correct on evidence.
Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.