Inzonex Carbon Hubpowered by inzonex.co.uk
Carbon HubCountry × industry → South Korea · Petrochemicals (steam cracking)
Data layer · est. 2023

Petrochemicals (steam cracking) in South Korea: emitters, CO2 & carbon value

10 tracked facilities, ≈17,359,518 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing petrochemicals (steam cracking).

The numbers

Petrochemicals (steam cracking) in South Korea at a glance

MetricValueNote
Facilities tracked10with CO2 estimates
Total est. CO217,359,518 t/yrClimate TRACE 2023
Average per facility1,735,952 t/yr
Gross value (full price)€1,389M/yrall tracked CO2 × €80.01/t EUA — before free allocation / EU-bound share

Carbon pricing here: K-ETS since 2015 — covers ~73% of national emissions; KAU price has traded ≈€5–10 (2024–25, World Bank State & Trends of Carbon Pricing 2025 / ICAP 2025). Current benchmark: no liquid market price. Full country page: carbon price in South Korea.

Largest emitters

Top 10 petrochemicals (steam cracking) CO2 emitters in South Korea

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Yeochon NCC, Yeochun Hanwha Group 3,098,945€247.9M
2LG Petrochemical Yeosu, Yeochun LG Chemical 2,712,425€217.0M
3Hanwha TotalEnergies Petrochemical, Daesan TotalEnergies SE2,068,224€165.5M
4LG Petrochemical Daesan, Daesan 1,763,076€141.1M
5Lotte Petrochemical Yeosu, Yeochun Lotte Chemical Corp1,668,141€133.5M
6Lotte Petrochemical Daesan, Daesan 1,491,834€119.4M
7KPIC Onsan Plant, Ulsan Korea Petrochemical Industries Corp1,220,591€97.7M
8SK geo centric, Ulsan SK Energy 1,166,343€93.3M
9Hyundai Chemical, Daesan Lotte Chemical Corp1,152,780€92.2M
10GS Caltex Yeosu, Yeochun Chevron Phillips Chemical 1,017,159€81.4M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes Inzonex Modular Insulation — snap-fastened modules engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access vs standard insulation jackets and metal cladding/boxes — unclips and refits in minutes, no destruction
  • Inspectable — opens for corrosion-under-insulation checks, then refits like-new (generic jackets often don't survive removal)
  • Typical payback under 2 years — some sites 9–11 months

Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.

Same industry, other countries
Other industries in South Korea
FAQ

Questions

How many petrochemicals (steam cracking) facilities does South Korea have with tracked emissions?
10 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈17,359,518 t CO2/yr.
What is the largest petrochemicals (steam cracking) emitter in South Korea?
Yeochon NCC, Yeochun — ≈3,098,945 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the EU price?
The gross full-price value is ≈€1,389M/yr (all tracked CO2 × €80.01/t EUA). Actual EU ETS cost is lower — free allocation still covers most industrial emissions, phasing out 2026→2034.
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex Research. Spotted an error? Tell us — we correct on evidence.
Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.