Inzonex Carbon Hubpowered by inzonex.co.uk
Carbon HubCountry × industry → Malaysia · Oil & gas production
Data layer · est. 2023

Oil & gas production in Malaysia: emitters, CO2 & carbon value

9 tracked facilities, ≈61,051,818 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing oil & gas production.

The numbers

Oil & gas production in Malaysia at a glance

MetricValueNote
Facilities tracked9with CO2 estimates
Total est. CO261,051,818 t/yrClimate TRACE 2023
Average per facility6,783,535 t/yr
Indicative carbon value€4,725M/yrat €77.4/t EUA

No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.

Largest emitters

Top 9 oil & gas production CO2 emitters in Malaysia

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Malaysia_Malay_Conventional shelfExxon Mobil Corp27,429,419€2,123.0M
2Malaysia_Sarawak - East Natuna_LNG16,437,205€1,272.2M
3Mayalsia_Joint development_Malay_Conventional shelf6,039,421€467.5M
4Malaysia_Baram Delta_Conventional shelf3,711,342€287.3M
5Malaysia_Baram Delta_LNG2,566,788€198.7M
6Malaysia_Baram Delta_Deepwater2,219,377€171.8M
7Malaysia_Sarawak - East Natuna_Conventional shelf1,336,883€103.5M
8Malaysia_Malay_Acid/sour gas1,206,093€93.4M
9Malaysia_West Natuna - Penyu_Conventional shelf105,290€8.1M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 90% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access than fixed cut-and-weld lagging — unclips and refits in minutes, no destruction
  • Inspectable — comes off to check for corrosion under insulation, then refits like-new (generic jackets often don't survive removal)
  • Typical payback under 2 years (some 9–11 months)
Same industry, other countries
Other industries in Malaysia
FAQ

Questions

How many oil & gas production facilities does Malaysia have with tracked emissions?
9 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈61,051,818 t CO2/yr.
What is the largest oil & gas production emitter in Malaysia?
Malaysia_Malay_Conventional shelf — ≈27,429,419 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the EU price?
≈€4,725M per year at €77.4/t — indicative full-price value; actual cost depends on free allocation and the local instrument.
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex — manufacturer of modular removable insulation (UK Patent GB2508992.1). Spotted an error? Tell us — we correct on evidence.
Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.