The dataset contains 11 records after repeated placeholder values are removed. The estimated total is 55,422,297 tonnes of carbon dioxide for 2023.
These are Climate TRACE modelled estimates for 2023. They are not verified declarations, current emissions, tax liabilities or CBAM liabilities.
Some records may represent facility clusters. Confirm the facility, operator, installation boundary, sector and reporting period before use.
| Rank | Facility | Modelled sector | Estimated t CO2, 2023 |
|---|---|---|---|
| 1 | Kazakhstan_Precaspian_Conventional onshore | oil-and-gas-production | 27,186,812 |
| 2 | Kazakhstan_Mangyshlak - Ustyurt_Conventional onshore | oil-and-gas-production | 9,543,123 |
| 3 | Kazakhstan_Precaspian_Acid/sour gas | oil-and-gas-production | 8,538,859 |
| 4 | Kazakhstan_Precaspian_Conventional shelf | oil-and-gas-production | 6,002,622 |
| 5 | Kazakhstan_North Ustyurt_Heavy oil | oil-and-gas-production | 1,778,539 |
| 6 | Kazakhstan_Turgay_Conventional onshore | oil-and-gas-production | 1,764,491 |
| 7 | Kazakhstan_North Ustyurt_Conventional onshore | oil-and-gas-production | 437,020 |
| 8 | Kazakhstan_Chu Sarysu_Conventional onshore | oil-and-gas-production | 75,699 |
| 9 | Kazakhstan_Precaspian_Heavy oil | oil-and-gas-production | 43,787 |
| 10 | Kazakhstan_North Ustyurt_Conventional shelf | oil-and-gas-production | 42,473 |
Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.
Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.
Country data for Kazakhstan · Industry assessment for oil and gas production