Inzonex
Modelled facility data · 2023

Oil and gas production facility estimates in Kazakhstan

The dataset contains 11 records after repeated placeholder values are removed. The estimated total is 55,422,297 tonnes of carbon dioxide for 2023.

Download the tableRead the methodology
01

Data status

These are Climate TRACE modelled estimates for 2023. They are not verified declarations, current emissions, tax liabilities or CBAM liabilities.

Some records may represent facility clusters. Confirm the facility, operator, installation boundary, sector and reporting period before use.

02

Largest estimates in this dataset

RankFacilityModelled sectorEstimated t CO2, 2023
1Kazakhstan_Precaspian_Conventional onshoreoil-and-gas-production27,186,812
2Kazakhstan_Mangyshlak - Ustyurt_Conventional onshoreoil-and-gas-production9,543,123
3Kazakhstan_Precaspian_Acid/sour gasoil-and-gas-production8,538,859
4Kazakhstan_Precaspian_Conventional shelfoil-and-gas-production6,002,622
5Kazakhstan_North Ustyurt_Heavy oiloil-and-gas-production1,778,539
6Kazakhstan_Turgay_Conventional onshoreoil-and-gas-production1,764,491
7Kazakhstan_North Ustyurt_Conventional onshoreoil-and-gas-production437,020
8Kazakhstan_Chu Sarysu_Conventional onshoreoil-and-gas-production75,699
9Kazakhstan_Precaspian_Heavy oiloil-and-gas-production43,787
10Kazakhstan_North Ustyurt_Conventional shelfoil-and-gas-production42,473

Download this table as CSV

Inzonex removable modular insulation on industrial equipment
Equipment heat loss

Measure exposed hot surfaces

Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.

  • Design target: surface temperature at or below 45 °C, subject to the application and design review
  • Claimed heat-loss reduction: up to 96%, subject to the measured boundary and insulation specification
  • Removable construction for inspection and maintenance access
  • Calculation record available for the selected equipment and operating conditions

Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.

03

Use the table with its boundary

  1. Confirm the facility identity.
  2. Confirm the sector classification.
  3. Replace the estimate with verified data where available.
  4. Keep facility emissions separate from product embedded emissions and trade flows.
  5. Record the source and review date.

Country data for Kazakhstan · Industry assessment for oil and gas production

Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.