Inzonex Carbon Hubpowered by inzonex.co.uk
Carbon HubCountry × industry → Kazakhstan · Oil & gas production
Data layer · est. 2023

Oil & gas production in Kazakhstan: emitters, CO2 & carbon value

11 tracked facilities, ≈55,422,297 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing oil & gas production.

The numbers

Oil & gas production in Kazakhstan at a glance

MetricValueNote
Facilities tracked11with CO2 estimates
Total est. CO255,422,297 t/yrClimate TRACE 2023
Average per facility5,038,391 t/yr
Indicative carbon value€4,290M/yrat €77.4/t EUA

Carbon pricing here: KAZ ETS since 2013 — price ≈€1–2/t (World Bank State & Trends of Carbon Pricing 2025 / ICAP 2025), far below the EU. Current benchmark: no liquid market price. Full country page: carbon price in Kazakhstan.

Largest emitters

Top 10 oil & gas production CO2 emitters in Kazakhstan

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Kazakhstan_Precaspian_Conventional onshoreChina National Petroleum Corp27,186,812€2,104.3M
2Kazakhstan_Mangyshlak - Ustyurt_Conventional onshoreMangistauMunaiGaz9,543,123€738.6M
3Kazakhstan_Precaspian_Acid/sour gas8,538,859€660.9M
4Kazakhstan_Precaspian_Conventional shelf6,002,622€464.6M
5Kazakhstan_North Ustyurt_Heavy oil1,778,539€137.7M
6Kazakhstan_Turgay_Conventional onshoreLUKOIL PJSC1,764,491€136.6M
7Kazakhstan_North Ustyurt_Conventional onshore437,020€33.8M
8Kazakhstan_Chu Sarysu_Conventional onshore75,699€5.9M
9Kazakhstan_Precaspian_Heavy oil43,787€3.4M
10Kazakhstan_North Ustyurt_Conventional shelf42,473€3.3M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 90% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access than fixed cut-and-weld lagging — unclips and refits in minutes, no destruction
  • Inspectable — comes off to check for corrosion under insulation, then refits like-new (generic jackets often don't survive removal)
  • Typical payback under 2 years (some 9–11 months)
Same industry, other countries
Other industries in Kazakhstan
FAQ

Questions

How many oil & gas production facilities does Kazakhstan have with tracked emissions?
11 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈55,422,297 t CO2/yr.
What is the largest oil & gas production emitter in Kazakhstan?
Kazakhstan_Precaspian_Conventional onshore — ≈27,186,812 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the EU price?
≈€4,290M per year at €77.4/t — indicative full-price value; actual cost depends on free allocation and the local instrument.
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex — manufacturer of modular removable insulation (UK Patent GB2508992.1). Spotted an error? Tell us — we correct on evidence.
Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.