Inzonex
Modelled facility data · 2023

Petrochemical steam cracking facility estimates in Iran

The dataset contains 11 records after repeated placeholder values are removed. The estimated total is 11,916,562 tonnes of carbon dioxide for 2023.

Download the tableRead the methodology
01

Data status

These are Climate TRACE modelled estimates for 2023. They are not verified declarations, current emissions, tax liabilities or CBAM liabilities.

Some records may represent facility clusters. Confirm the facility, operator, installation boundary, sector and reporting period before use.

02

Largest estimates in this dataset

RankFacilityModelled sectorEstimated t CO2, 2023
1Kavian Petrochemical Company (11th Olefin complex), Assaluyeh,Bushehrpetrochemical-steam-cracking2,606,969
2Jam Petrochemical Co. (10th Olefin omplex), Assaluyeh,Bushehrpetrochemical-steam-cracking1,853,494
3Marun Petrochemical Co. (7th Olefin complex), Bandar Imam Khommeini,Khuzekstanpetrochemical-steam-cracking1,433,833
4Arya Sasol Polymer Co. (9th Olefin complex), Assaluyeh,Bushehrpetrochemical-steam-cracking1,368,659
5Gachsaran Petrochemical Company (8th Olefin complex), Gachsaran,Kohgiluyeh and Boyer-Amad petrochemical-steam-cracking1,303,485
6Bandar Imam Petrochemical Co. , Bandar Imam Khommeini,Khuzekstanpetrochemical-steam-cracking761,008
7Amir Kabir Petrochemical Co. (6th Olefin complex), Bandar Imam Khommeini,Khuzekstanpetrochemical-steam-cracking730,164
8Morvarid Petrochemical Company (5th Olefin complex), Assaluyeh,Bushehrpetrochemical-steam-cracking651,742
9Ilam Petrochemical Company (13th Olefin complex), Lashekan,Ilammpetrochemical-steam-cracking586,568
10(Shazand) Arak Petrochemical, Arak,Marzakipetrochemical-steam-cracking429,674

Download this table as CSV

Inzonex removable modular insulation on industrial equipment
Equipment heat loss

Measure exposed hot surfaces

Use measured surface area, temperature and operating hours to calculate heat loss from boilers, kilns, heat exchangers, valves and pipework. Inzonex supplies removable modular insulation for equipment that requires maintenance access.

  • Design target: surface temperature at or below 45 °C, subject to the application and design review
  • Claimed heat-loss reduction: up to 96%, subject to the measured boundary and insulation specification
  • Removable construction for inspection and maintenance access
  • Calculation record available for the selected equipment and operating conditions

Do not add a calculated reduction to an emissions report until the reporting boundary, factor, implementation date and verification method have been approved.

03

Use the table with its boundary

  1. Confirm the facility identity.
  2. Confirm the sector classification.
  3. Replace the estimate with verified data where available.
  4. Keep facility emissions separate from product embedded emissions and trade flows.
  5. Record the source and review date.

Industry assessment for petrochemical steam cracking

Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.