11 tracked facilities, ≈11,916,562 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing petrochemicals (steam cracking).
| Metric | Value | Note |
|---|---|---|
| Facilities tracked | 11 | with CO2 estimates |
| Total est. CO2 | 11,916,562 t/yr | Climate TRACE 2023 |
| Average per facility | 1,083,324 t/yr | |
| Gross value (full price) | €953M/yr | all tracked CO2 × €80.01/t EUA — before free allocation / EU-bound share |
No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.
| # | Facility | Owner | t CO2/yr (est. 2023) | Indicative value |
|---|---|---|---|---|
| 1 | Kavian Petrochemical Company (11th Olefin complex), Assaluyeh,Bushehr | Bakhtar Chemical Co | 2,606,969 | €208.6M |
| 2 | Jam Petrochemical Co. (10th Olefin omplex), Assaluyeh,Bushehr | Justice Shares Broker Co | 1,853,494 | €148.3M |
| 3 | Marun Petrochemical Co. (7th Olefin complex), Bandar Imam Khommeini,Khuzekstan | Social Security Organization and Armed Forces | 1,433,833 | €114.7M |
| 4 | Arya Sasol Polymer Co. (9th Olefin complex), Assaluyeh,Bushehr | Pars Tammin Majd Co | 1,368,659 | €109.5M |
| 5 | Gachsaran Petrochemical Company (8th Olefin complex), Gachsaran,Kohgiluyeh and Boyer-Amad | Borujen Petrochemical | 1,303,485 | €104.3M |
| 6 | Bandar Imam Petrochemical Co. , Bandar Imam Khommeini,Khuzekstan | Persian Gulf Petrochemical Industries Co | 761,008 | €60.9M |
| 7 | Amir Kabir Petrochemical Co. (6th Olefin complex), Bandar Imam Khommeini,Khuzekstan | natural person(s) | 730,164 | €58.4M |
| 8 | Morvarid Petrochemical Company (5th Olefin complex), Assaluyeh,Bushehr | Taban Farda Petrochemical Group Co | 651,742 | €52.1M |
| 9 | Ilam Petrochemical Company (13th Olefin complex), Lashekan,Ilamm | Iranian Investment Petrochemical Group Co | 586,568 | €46.9M |
| 10 | (Shazand) Arak Petrochemical, Arak,Marzaki | Atie Saba Investment Co | 429,674 | €34.4M |
Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.
Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes Inzonex Modular Insulation — snap-fastened modules engineered per temperature tier, not generic off-the-shelf jackets:
Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.