6 tracked facilities, ≈4,745,337 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing cement.
| Metric | Value | Note |
|---|---|---|
| Facilities tracked | 6 | with CO2 estimates |
| Total est. CO2 | 4,745,337 t/yr | Climate TRACE 2023 |
| Average per facility | 790,890 t/yr | |
| Gross value (full price) | €358M/yr | all tracked CO2 × €75.36/t CBAM ref — before free allocation / EU-bound share |
Carbon pricing here: No general national carbon tax — EU ETS only. Current benchmark: €80.01/t (July 13, 2026). Full country page: carbon price in Greece.
| # | Facility | Owner | t CO2/yr (est. 2023) | Indicative value |
|---|---|---|---|---|
| 1 | Agria Cement Plant | Heracles General Cement Co | 1,622,464 | €122.3M |
| 2 | Aliveri Cement Plant | Heracles General Cement Co | 990,661 | €74.7M |
| 3 | Pio Cement Plant | Titan Cement International SA | 741,582 | €55.9M |
| 4 | Efkarpia Cement Plant | Titan Cement International SA | 563,869 | €42.5M |
| 5 | Magoula Cement Plant | Titan Cement International SA | 533,322 | €40.2M |
| 6 | Apropyrgos Cement Plant | Heidelberg Materials Hellas SA | 293,439 | €22.1M |
Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.
Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes Inzonex Modular Insulation — snap-fastened modules engineered per temperature tier, not generic off-the-shelf jackets:
Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.