Inzonex Carbon Hubpowered by inzonex.co.uk
Carbon HubCountry × industry → Canada · Cement
Data layer · est. 2023

Cement in Canada: emitters, CO2 & carbon value

15 tracked facilities, ≈8,230,047 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing cement.

The numbers

Cement in Canada at a glance

MetricValueNote
Facilities tracked15with CO2 estimates
Total est. CO28,230,047 t/yrClimate TRACE 2023
Average per facility548,670 t/yr
Indicative carbon value€620M/yrat €75.36/t CBAM

Carbon pricing here: Industrial OBPS systems continue (≈C$80/t trajectory, 2025); consumer fuel charge removed Apr 2025. Current benchmark: no liquid market price. Full country page: carbon price in Canada.

Largest emitters

Top 10 cement CO2 emitters in Canada

#FacilityOwnert CO2/yr (est. 2023)Indicative value
1Bowmanville Cement PlantSt Marys Cement Inc (Canada)1,337,509€100.8M
2Port Daniel Cement PlantSt Marys Cement Inc (Canada)1,275,488€96.1M
3Exshaw Cement PlantLafarge Canada Inc901,178€67.9M
4St. Mary Cement PlantSt Marys Cement Inc (Canada)779,505€58.7M
5Saint Basile Cement PlantCiment Quebec Inc615,898€46.4M
6Heidelberg Delta Cement Plant 2Heidelberg Materials US Inc615,883€46.4M
7Mississauga Cement PlantCRH Canada Group Inc527,094€39.7M
8Bath Cement PlantLafarge Canada Inc450,824€34.0M
9Embro Cement PlantFederal White Cement Ltd340,500€25.7M
10Picton Cement PlantHeidelberg Materials US Inc328,310€24.7M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex removable modular insulation on industrial equipment
Cut the tonnes at the source

Hot industrial equipment? Cut the heat loss.

Boilers, kilns, heat exchangers, valves and steam lines lose energy continuously. Inzonex makes patented (UK GB2508992.1) removable modular insulation — snap-fastened covers engineered per temperature tier, not generic off-the-shelf jackets:

  • Up to 90% less heat loss from insulated surfaces
  • Surface temperature ≤45 °C — touch-safe for workers (EN ISO 13732-1)
  • 6× faster maintenance access than fixed cut-and-weld lagging — unclips and refits in minutes, no destruction
  • Inspectable — comes off to check for corrosion under insulation, then refits like-new (generic jackets often don't survive removal)
  • Typical payback under 2 years (some 9–11 months)
Same industry, other countries
Other industries in Canada
FAQ

Questions

How many cement facilities does Canada have with tracked emissions?
15 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈8,230,047 t CO2/yr.
What is the largest cement emitter in Canada?
Bowmanville Cement Plant — ≈1,337,509 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the CBAM price?
≈€620M per year at €75.36/t — indicative full-price value; actual cost depends on the EU-bound export share.
How this page is built: heat-loss figures follow ASTM C680 / ISO 12241 (the method behind our public calculators); facility emissions from Climate TRACE & EU ETS verified data across 30,000+ industrial sites; the 2026–2034 schedule is Regulation (EU) 2023/956, not a forecast. Published by Inzonex — manufacturer of modular removable insulation (UK Patent GB2508992.1). Spotted an error? Tell us — we correct on evidence.
Source: Inzonex Carbon Hub — inzonex.co.uk/carbon · prices dated as shown on each figure · schedule per Regulation (EU) 2023/956 · indicative analytics, not compliance advice.