Tis Abay I is a 73 MW hydro power plant in Amhara, Ethiopia. It is operated by Ethiopian Electric Power Corp. Based on its capacity (estimated), it can supply roughly 73k homes (estimated). It ranks #12 of 15 Ethiopia power plants by installed capacity. Commissioned in 2001, it is around 25 years old — relatively modern. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, hydro supplies about 96.5% of Ethiopia's electricity; the national grid averages 23 gCO₂/kWh (100.0% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1000064.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The public capacity above is the current source-record value. A 2026 tracker candidate lists 73 MW for Tis Abay II hydroelectric plant, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).
Capacity claim grade: B_SCOPE_PARENT_COMPLEX - recommended action: build_parent_complex_model - confidence: not_comparable_without_scope. This follows a claim-based data model: value + scope + source + confidence, rather than silently overwriting records.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: GEM tracker 2026 (location L100001025939); fuel: WRI source-record fuel
At 73 MW, Tis Abay I is below the median hydro plant in Ethiopia (153 MW). Technically it is described as unknown. Hydropower converts the energy of falling or flowing water into electricity; output depends on rainfall and reservoir level, and large dams also provide grid balancing and storage.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Ethiopian Electric Power Corp.
This hydro plant converts the energy of falling or flowing water through hydro turbines. It sits in a subtropical highland climate (Köppen Cwb) — Northern Hemisphere, latitude 11.5°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 98% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 14/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #9 largest hydro power plant of 11 in Ethiopia by capacity.
Ethiopia has 11 hydro power plants in this dataset, together about 3,797 MW of capacity.
Coordinates 11.4887, 37.5999 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Tis Abay I is a 73 MW source-record hydro power plant in Amhara, Ethiopia, commissioned in 2001.
Its output is enough to supply roughly 73,083 homes (estimated).
Tis Abay I is operated by Ethiopian Electric Power Corp.