Threemile Digester is a 5 MW biomass power plant in Oregon, United States of America. It is operated by TMF Biofuels LLC. Based on reported annual generation of 33 GWh, it can supply roughly 9.4k homes. It ranks #7315 of 10,938 United States of America power plants by installed capacity. Commissioned in 2013, it is around 13 years old — relatively modern. In context, biomass supplies about 1.0% of United States of America's electricity; the national grid averages 384 gCO₂/kWh (43.0% low-carbon) (2025).

5Source-backed capacity
33GWh reported / yr
9,371homes powered
2013commissioned (~13 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id USA0058382.

Data status

Known data

FacilityThreemile Digester WRI
CountryUnited States of America · Oregon WRI
Coordinates45.71, -119.9011 WRI
FuelBiomass WRI
MW installed capacity5 MW WRI source record; scope not independently normalised
OwnerTMF Biofuels LLC WRI
Commissioned2013 WRI
GWh reported / yr33 GWh/yr WRI

Calculated from dataset

Capacity rank in country#7315 of 10938 calculated
Fuel-specific rank in country#118 of 184 calculated
Capacity vs country/fuel peers0.27× · 18 MW median · 184 peers calculated
Homes-powered equivalent9,371 calculated from reported generation
Climate11.5°C · HDD 2,685 derived from coordinates
Environmental severityC1 · 35/100 derived from coordinates

Not available

TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset
CO₂ emissionsNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.

capacity: Wikidata P2109 nameplate capacity; fuel: WRI source-record fuel

In context: how this plant compares

At 5 MW, Threemile Digester is below the median biomass plant in United States of America (18 MW). Biomass plants burn organic material such as wood, residues or waste-derived fuel to raise steam; they are dispatchable and counted as low-carbon where the feedstock is sustainably sourced.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Reported generation trend

2013: 22 GWh20132014: 35 GWh20142015: 34 GWh20152016: 16 GWh20162017: 29 GWh20172018: 32 GWh20182019: 33 GWh201935 GWh

Annual generation (GWh), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by TMF Biofuels LLC.

Local climate & thermal context

This biomass plant burns organic material (wood, residues) to raise steam for a turbine. It sits in a cold semi-arid steppe climate (Köppen BSk) — Northern Hemisphere, latitude 45.7°N — which shapes how much energy it can produce and how its output varies through the year.

11.5°Cannual mean temp
2,685heating degree-days (base 18°C)
347cooling degree-days (base 18°C)
307 melevation

Monthly mean temperature

J: 1 °CJF: 4 °CFM: 8 °CMA: 11 °CAM: 15 °CMJ: 19 °CJJ: 23 °CJA: 23 °CAS: 18 °CSO: 11 °CON: 5 °CND: 1 °CD23 °C

Heating degree-days here run 9% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 54/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.

C1ISO 9223 corrosivity (indicative)
35/100environmental-severity index
22.3°Cseasonal temperature swing
275 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #118 largest biomass power plant of 184 in United States of America by capacity.

United States of America has 184 biomass power plants in this dataset, together about 6,324 MW of capacity.

Nearby power plants

Location

Coordinates 45.71, -119.9011 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Threemile Digester?

Threemile Digester is a 5 MW source-record biomass power plant in Oregon, United States of America, commissioned in 2013.

How much electricity does Threemile Digester generate?

Threemile Digester generates about 33 GWh of electricity per year.

How many homes can Threemile Digester power?

Its output is enough to supply roughly 9,371 homes.

Who operates Threemile Digester?

Threemile Digester is operated by TMF Biofuels LLC.