Home / Asia / Pakistan / SITE

SITE

Gas power plant in Sindh, Pakistan. Approximate location 24.904919, 66.975936.

GasSindhPakistanEngine

SITE is a 86 MW gas power plant in Sindh, Pakistan. It is operated by Karachi Electric Supply Company (KESC). Based on its capacity (estimated), it can supply roughly 97k homes (estimated). It ranks #102 of 122 Pakistan power plants by installed capacity. Commissioned in 2009, it is around 17 years old — relatively modern. In context, gas supplies about 21.0% of Pakistan's electricity; the national grid averages 347 gCO₂/kWh (54.9% low-carbon) (2025).

86Source-backed capacity
97,311homes powered (est.)
2009commissioned (~17 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1001623.

Data status

Known data

FacilitySITE WRI
CountryPakistan · Sindh WRI
Coordinates24.904919, 66.975936 WRI
FuelGas WRI
MW installed capacity86 MW WRI source record; scope not independently normalised
OwnerKarachi Electric Supply Company (KESC) WRI
Commissioned2009 WRI
TechnologyEngine WRI

Calculated from dataset

CO₂ emissions136,236 t CO₂/yr calculated
Capacity rank in country#102 of 122 calculated
Fuel-specific rank in country#29 of 31 calculated
Capacity vs country/fuel peers0.38× · 227 MW median · 31 peers calculated
Homes-powered equivalent97,311 calculated
Climate26.2°C · HDD 0 derived from coordinates
Environmental severityC5 · 61/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Capacity provenance

The public capacity above is the current source-record value. A 2026 tracker candidate lists 86 MW for Site gas power station, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).

Capacity claim grade: A2_MEDIUM_REVIEW - recommended action: manual_source_check - confidence: medium. This follows a claim-based data model: value + scope + source + confidence, rather than silently overwriting records.

Data provenance

The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.

capacity: GEM tracker 2026 (location L100000408411); fuel: WRI source-record fuel

In context: how this plant compares

At 86 MW, SITE is below the median gas plant in Pakistan (227 MW). Technically it is described as Engine. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest gas plants in Pakistan

Guddu: 1,762 MW2kGudduKAPCO power station: 1,600 MW2kKAPCO powe…Muzaffargarh power station: 1,350 MW1kMuzaffarga…Balloki power station: 1,320 MW1kBalloki po…Trimmu power station: 1,263 MW1kTrimmu pow…Haveli Bahadur Shah (HBS) power station: 1,230 MW1kHaveli Bah…Bhikki power station: 1,180 MW1kBhikki pow…Jamshoro power station: 880 MW880Jamshoro p…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Karachi Electric Supply Company (KESC).

Local climate & thermal context

This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 24.9°N — which shapes how much energy it can produce and how its output varies through the year.

26.2°Cannual mean temp
0heating degree-days (base 18°C)
3,002cooling degree-days (base 18°C)
8 melevation

Monthly mean temperature

J: 18 °CJF: 20 °CFM: 24 °CMA: 28 °CAM: 31 °CMJ: 32 °CJJ: 30 °CJA: 29 °CAS: 29 °CSO: 28 °CON: 24 °CND: 20 °CD32 °C

This site has effectively no heating season (tropical/equatorial climate), so winter heat loss is not the driver here. The thermal concern shifts to year-round process heat and humidity/heat-driven corrosion of hot equipment.

A gas turbine here also runs ~8% below its ISO (15°C) rating at this annual mean (typical CCGT curve, estimate).

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
61/100environmental-severity index
13.0°Cseasonal temperature swing
41 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #29 largest gas power plant of 31 in Pakistan by capacity.

Pakistan has 31 gas power plants in this dataset, together about 15,945 MW of capacity.

Nearby power plants

Location

Coordinates 24.904919, 66.975936 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is SITE?

SITE is a 86 MW source-record gas power plant in Sindh, Pakistan, commissioned in 2009.

How many homes can SITE power?

Its output is enough to supply roughly 97,311 homes (estimated).

Who operates SITE?

SITE is operated by Karachi Electric Supply Company (KESC).

Built from open public data; no personal information. Operate this site? Request a correction or removal.