Home / Asia / Pakistan / Korangi (gas turbine)

Korangi (gas turbine)

Gas power plant in Sindh, Pakistan. Approximate location 24.8483, 67.1453.

GasSindhPakistan

Korangi (gas turbine) is a 80 MW gas power plant in Sindh, Pakistan. It is operated by Karachi Electric Supply Company (KESC). Based on its capacity (estimated), it can supply roughly 90k homes (estimated). It ranks #104 of 122 Pakistan power plants by installed capacity. In context, gas supplies about 21.0% of Pakistan's electricity; the national grid averages 347 gCO₂/kWh (54.9% low-carbon) (2025).

80Source-backed capacity
90,102homes powered (est.)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1001622.

Data status

Known data

FacilityKorangi (gas turbine) WRI
CountryPakistan · Sindh WRI
Coordinates24.8483, 67.1453 WRI
FuelGas WRI
MW installed capacity80 MW WRI source record; scope not independently normalised
OwnerKarachi Electric Supply Company (KESC) WRI

Calculated from dataset

CO₂ emissions126,144 t CO₂/yr calculated
Capacity rank in country#104 of 122 calculated
Fuel-specific rank in country#31 of 31 calculated
Capacity vs country/fuel peers0.35× · 227 MW median · 31 peers calculated
Homes-powered equivalent90,102 calculated
Climate25.8°C · HDD 2 derived from coordinates
Environmental severityC5 · 61/100 derived from coordinates

Not available

CommissionedNot available not in dataset
TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.

capacity: GEM tracker 2026 (location L100000408412); fuel: WRI source-record fuel

In context: how this plant compares

At 80 MW, Korangi (gas turbine) is below the median gas plant in Pakistan (227 MW). Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest gas plants in Pakistan

Guddu: 1,762 MW2kGudduKAPCO power station: 1,600 MW2kKAPCO powe…Muzaffargarh power station: 1,350 MW1kMuzaffarga…Balloki power station: 1,320 MW1kBalloki po…Trimmu power station: 1,263 MW1kTrimmu pow…Haveli Bahadur Shah (HBS) power station: 1,230 MW1kHaveli Bah…Bhikki power station: 1,180 MW1kBhikki pow…Jamshoro power station: 880 MW880Jamshoro p…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Karachi Electric Supply Company (KESC).

Local climate & thermal context

This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 24.8°N — which shapes how much energy it can produce and how its output varies through the year.

25.8°Cannual mean temp
2heating degree-days (base 18°C)
2,849cooling degree-days (base 18°C)
6 melevation

Monthly mean temperature

J: 18 °CJF: 20 °CFM: 24 °CMA: 28 °CAM: 30 °CMJ: 31 °CJJ: 30 °CJA: 29 °CAS: 29 °CSO: 28 °CON: 24 °CND: 20 °CD31 °C

Heating degree-days here run 100% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 13/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.

A gas turbine here also runs ~8% below its ISO (15°C) rating at this annual mean (typical CCGT curve, estimate).

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
61/100environmental-severity index
13.2°Cseasonal temperature swing
41 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #31 largest gas power plant of 31 in Pakistan by capacity.

Pakistan has 31 gas power plants in this dataset, together about 15,945 MW of capacity.

Nearby power plants

Location

Coordinates 24.8483, 67.1453 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Korangi (gas turbine)?

Korangi (gas turbine) is a 80 MW source-record gas power plant in Sindh, Pakistan.

How many homes can Korangi (gas turbine) power?

Its output is enough to supply roughly 90,102 homes (estimated).

Who operates Korangi (gas turbine)?

Korangi (gas turbine) is operated by Karachi Electric Supply Company (KESC).

Built from open public data; no personal information. Operate this site? Request a correction or removal.