Senj Hydroelectric Power System Croatia Croatia

Hydro power plant in Licko-Senjska, Croatia. Approximate location 44.9429, 14.9276.

HydroLicko-SenjskaCroatia

Senj Hydroelectric Power System Croatia Croatia is a 216 MW hydro power station in Licko-Senjska, Croatia. Based on its capacity (estimated), it can supply roughly 216,246 homes (estimated). It ranks #7 of 24 Croatia power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, hydro supplies about 39.3% of Croatia's electricity; the national grid averages 158 gCO₂/kWh (76.3% low-carbon) (2025).

216MW installed capacity
216,246homes powered (est.)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id GEODB0044842.

Capacity vs largest hydro plants in Croatia

Zakucac Hydroelectric Power Plant Croatia: 522 MW522Zakucac Hy…Orlovac Hydroelectric Power Plant Croatia: 237 MW237Orlovac Hy…Senj Hydroelectric Power System Croatia Croatia: 216 MW216Senj Hydro…Varazdin Hydroelectric Power Plant Croatia Croatia: 94 MW94Varazdin H…Vinodol Hydroelectric Power System Croatia Croatia: 90 MW90Vinodol Hy…Cakovec Hydroelectric Power Plant Croatia Croatia: 76 MW76Cakovec Hy…Dubrava Hydroelectric Power Plant Croatia Croatia: 76 MW76Dubrava Hy…Peruca Hydroelectric Power Plant Croatia: 60 MW60Peruca Hyd…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Local climate & thermal context

This hydro plant converts the energy of falling or flowing water through hydro turbines. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 44.9°N — which shapes how much energy it can produce and how its output varies through the year.

8.3°Cannual mean temp
3,526heating degree-days (base 18°C)
0cooling degree-days (base 18°C)
730 melevation

Monthly mean temperature

J: 0 °CJF: 0 °CFM: 4 °CMA: 7 °CAM: 12 °CMJ: 15 °CJJ: 18 °CJA: 17 °CAS: 13 °CSO: 9 °CON: 4 °CND: 0 °CD18 °C

Heating degree-days here run 43% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 76/100 — this site sits in the top third of the power plants we cover by heating degree-days.

In colder climates, uninsulated hot equipment (boilers, turbines, valves, steam lines) loses proportionally more heat to ambient air — exactly the loss Inzonex modular insulation is designed to cut.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

How it compares & nearby plants

The #3 largest hydro power plant of 17 in Croatia by capacity.

Croatia has 17 hydro power plants in this dataset, together about 1,623 MW of capacity.

Nearby power plants

Location

Coordinates 44.9429, 14.9276 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Built from open public data; no personal information. Operate this site? Request a correction or removal.