Home / Europe / Spain / PARQUE EOLICO SIERRA DEL MADERO I

PARQUE EOLICO SIERRA DEL MADERO I — Spain

Wind power plant in Castille and Leon, Spain. Approximate location 41.779, -1.9839.

WindCastille and LeonSpain

PARQUE EOLICO SIERRA DEL MADERO I is a 14.8 MW wind power plant in Castille and Leon, Spain. It is operated by PARQUE EOLICO SIERRA DEL MADERO SA.. Based on its capacity (estimated), it can supply roughly 13k homes (estimated). It ranks #672 of 899 Spain power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 20.4% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).

14.8MW installed capacity
12,594homes powered (est.)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1007681.

Data status

Known data

FacilityPARQUE EOLICO SIERRA DEL MADERO I WRI
CountrySpain · Castille and Leon WRI
Coordinates41.779, -1.9839 WRI
FuelWind WRI
MW installed capacity14.8 MW GEM · 2026 · L100000910015; part of a generating complex
Verification noteQuality label backfilled from existing source-backed capacity provenance on 2026-07-05; capacity value was not changed. source-verified
OwnerPARQUE EOLICO SIERRA DEL MADERO SA. WRI

Calculated from dataset

Capacity rank in country#672 / 899 calculated
Fuel-specific rank in country#307 / 341 calculated
Capacity vs country/fuel peers0.49× · 30 MW · n=341 calculated
Homes-powered equivalent12,594 calculated
Climate9.1°C · HDD 3,253 derived from coordinates
Environmental severityC2 · 26/100 derived from coordinates

Not available

CommissionedNot available not in dataset
TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

Source of the capacity and fuel values:

capacity: GEM · 2026 · L100000910015; fuel: WRI GPPD

In context: how this plant compares

At 14.8 MW, PARQUE EOLICO SIERRA DEL MADERO I is below the median wind plant in Spain (30 MW). Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Share of Spain wind capacity
0.1% of 11,361 MW across 341 plants in this dataset

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest wind plants in Spain

SAN LORENZO A: 150 MW150SAN LORENZ…P.E. DOLAR 1: 100 MW100P.E. DOLAR…P.E. TORRE MIRO II: 99 MW99P.E. TORRE…PARAMO DE POZA I: 97 MW97PARAMO DE …PARQUE EOLICO ALTO PALANCIA III: 94 MW94PARQUE EOL…P.E. TARDIENTA I: 94 MW94P.E. TARDI…PENAFLOR III: 90 MW90PENAFLOR I…P.E. SAN JUAN DE BARGAS (UNIFICADO): 90 MW90P.E. SAN J…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by PARQUE EOLICO SIERRA DEL MADERO SA..

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 41.8°N — which shapes how much energy it can produce and how its output varies through the year.

9.1°Cannual mean temp
3,253heating degree-days (base 18°C)
32cooling degree-days (base 18°C)
1,260 melevation

Monthly mean temperature

J: 1 °CJF: 3 °CFM: 5 °CMA: 6 °CAM: 10 °CMJ: 15 °CJJ: 18 °CJA: 18 °CAS: 15 °CSO: 10 °CON: 5 °CND: 2 °CD18 °C

Heating degree-days here run 32% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 70/100 — this site sits in the top third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.

C2ISO 9223 corrosivity (indicative)
26/100environmental-severity index
17.1°Cseasonal temperature swing
155 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #307 largest wind power plant of 341 in Spain by capacity.

Spain has 341 wind power plants in this dataset, together about 11,361 MW of capacity.

Nearby power plants

Location

Coordinates 41.779, -1.9839 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is PARQUE EOLICO SIERRA DEL MADERO I?

PARQUE EOLICO SIERRA DEL MADERO I is a 14.8 MW wind power plant in Castille and Leon, Spain.

Who operates PARQUE EOLICO SIERRA DEL MADERO I?

PARQUE EOLICO SIERRA DEL MADERO I is operated by PARQUE EOLICO SIERRA DEL MADERO SA..

Built from open public data; no personal information. Operate this site? Request a correction or removal.