Home / Europe / Spain / AMPLIACION SIERRA DEL CORTADO

AMPLIACION SIERRA DEL CORTADO — Spain

Wind power plant in Castille and Leon, Spain. Approximate location 41.7389, -2.1697.

WindCastille and LeonSpain

AMPLIACION SIERRA DEL CORTADO is a 13.5 MW wind power plant in Castille and Leon, Spain. It is operated by PARQUE EOLICO SIERRA DEL MADERO S.A.. Based on its capacity (estimated), it can supply roughly 11k homes (estimated). It ranks #699 of 899 Spain power plants by installed capacity. Commissioned in 2013, it is around 13 years old — relatively modern. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 20.4% of Spain's electricity; the national grid averages 154 gCO₂/kWh (74.6% low-carbon) (2025).

13.5MW installed capacity
11,488homes powered (est.)
2013commissioned (~13 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1006193.

Data status

Known data

FacilityAMPLIACION SIERRA DEL CORTADO WRI
CountrySpain · Castille and Leon WRI
Coordinates41.7389, -2.1697 WRI
FuelWind WRI
MW installed capacity13.5 MW GEM · 2026 · L100000910014; part of a generating complex
Verification noteQuality label backfilled from existing source-backed capacity provenance on 2026-07-05; capacity value was not changed. source-verified
OwnerPARQUE EOLICO SIERRA DEL MADERO S.A. WRI
Commissioned2013 WRI

Calculated from dataset

Capacity rank in country#699 / 899 calculated
Fuel-specific rank in country#321 / 341 calculated
Capacity vs country/fuel peers0.45× · 30 MW · n=341 calculated
Homes-powered equivalent11,488 calculated
Climate10.5°C · HDD 2,849 derived from coordinates
Environmental severityC2 · 27/100 derived from coordinates

Not available

TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Capacity provenance

The public capacity above is the current source-record value. A 2026 tracker candidate lists 32 MW for Sierra Del Cortado wind farm, but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).

Data provenance

Source of the capacity and fuel values:

capacity: GEM · 2026 · L100000910014; fuel: WRI GPPD

In context: how this plant compares

At 13.5 MW, AMPLIACION SIERRA DEL CORTADO is below the median wind plant in Spain (30 MW). Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Share of Spain wind capacity
0.1% of 11,361 MW across 341 plants in this dataset
Age among peers
243 of 252 dated wind plants in Spain are older

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest wind plants in Spain

SAN LORENZO A: 150 MW150SAN LORENZ…P.E. DOLAR 1: 100 MW100P.E. DOLAR…P.E. TORRE MIRO II: 99 MW99P.E. TORRE…PARAMO DE POZA I: 97 MW97PARAMO DE …PARQUE EOLICO ALTO PALANCIA III: 94 MW94PARQUE EOL…P.E. TARDIENTA I: 94 MW94P.E. TARDI…PENAFLOR III: 90 MW90PENAFLOR I…P.E. SAN JUAN DE BARGAS (UNIFICADO): 90 MW90P.E. SAN J…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by PARQUE EOLICO SIERRA DEL MADERO S.A..

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 41.7°N — which shapes how much energy it can produce and how its output varies through the year.

10.5°Cannual mean temp
2,849heating degree-days (base 18°C)
124cooling degree-days (base 18°C)
1,048 melevation

Monthly mean temperature

J: 2 °CJF: 4 °CFM: 6 °CMA: 8 °CAM: 12 °CMJ: 16 °CJJ: 20 °CJA: 20 °CAS: 16 °CSO: 11 °CON: 6 °CND: 4 °CD20 °C

Heating degree-days here run 16% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 58/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.

C2ISO 9223 corrosivity (indicative)
27/100environmental-severity index
17.5°Cseasonal temperature swing
168 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #321 largest wind power plant of 341 in Spain by capacity.

Spain has 341 wind power plants in this dataset, together about 11,361 MW of capacity.

Nearby power plants

Location

Coordinates 41.7389, -2.1697 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is AMPLIACION SIERRA DEL CORTADO?

AMPLIACION SIERRA DEL CORTADO is a 13.5 MW wind power plant in Castille and Leon, Spain, commissioned in 2013.

Who operates AMPLIACION SIERRA DEL CORTADO?

AMPLIACION SIERRA DEL CORTADO is operated by PARQUE EOLICO SIERRA DEL MADERO S.A..

Built from open public data; no personal information. Operate this site? Request a correction or removal.