Home / South America / Argentina / MAYOR BURATOVICH

MAYOR BURATOVICH — Argentina

Wind power plant in Buenos Aires, Argentina. Approximate location -39.2291, -62.6497.

WindBuenos AiresArgentinaOnshore

MAYOR BURATOVICH is a 2 MW wind power plant in Buenos Aires, Argentina. It is operated by COOPERATIVAS. Based on its capacity (estimated), it can supply roughly 1.7k homes (estimated). It ranks #261 of 275 Argentina power plants by installed capacity. Commissioned in 2020, it is around 6 years old — recently built. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, wind supplies about 12.2% of Argentina's electricity; the national grid averages 346 gCO₂/kWh (41.6% low-carbon) (2025).

2MW installed capacity
1,701homes powered (est.)
2020commissioned (~6 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id ARG0000015.

Data status

Known data

FacilityMAYOR BURATOVICH WRI
CountryArgentina · Buenos Aires WRI
Coordinates-39.2291, -62.6497 WRI
FuelWind WRI
MW installed capacity2 MW WRI GPPD; source record
OwnerCOOPERATIVAS WRI
Commissioned2020 WRI
TechnologyOnshore WRI

Calculated from dataset

Capacity rank in country#261 / 275 calculated
Fuel-specific rank in country#10 / 12 calculated
Capacity vs country/fuel peers0.12× · 16.6 MW · n=12 calculated
Homes-powered equivalent1,701 calculated
Climate15.0°C · HDD 1,509 derived from coordinates
Environmental severityC4 · 35/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

Capacity and fuel are the upstream open-dataset record, not yet matched to a 2026 registry or GEM entry.

capacity: WRI GPPD; fuel: WRI GPPD

In context: how this plant compares

At 2 MW, MAYOR BURATOVICH is below the median wind plant in Argentina (16.6 MW). Technically it is described as Onshore. Wind turbines convert moving air into electricity; output is variable and site-dependent, and modern turbines deliver some of the lowest-cost new generation on many grids.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Share of Argentina wind capacity
0.9% of 212 MW across 12 plants in this dataset
Age among peers
3 of 4 dated wind plants in Argentina are older

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest wind plants in Argentina

PARQUE EOLICO LOMA BLANCA IV (ENARSA): 50 MW50PARQUE EOL…PARQUE EOLICO RAWSON I (ENARSA): 49 MW49PARQUE EOL…PARQUE EOLICO RAWSON II (ENARSA): 29 MW29PARQUE EOL…PARQUE EOLICO ARAUCO SAPEM I: 25 MW25PARQUE EOL…PARQUE EOLICO ARAUCO SAPEM II: 25 MW25PARQUE EOL…COMODORO RIVADAVIA - ANTONIO MORAN: 17 MW17COMODORO R…PARQUE EOLICO DIADEMA: 6 MW6PARQUE EOL…PARQUE EOLICO EL TORDILLO: 3 MW3PARQUE EOL…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by COOPERATIVAS.

Local climate & thermal context

This wind plant converts the kinetic energy of wind into electricity through turbine rotors. It sits in a humid subtropical climate (Köppen Cfa) — Southern Hemisphere, latitude 39.2°S — which shapes how much energy it can produce and how its output varies through the year.

15.0°Cannual mean temp
1,509heating degree-days (base 18°C)
395cooling degree-days (base 18°C)
15 melevation

Monthly mean temperature

J: 23 °CJF: 22 °CFM: 19 °CMA: 15 °CAM: 11 °CMJ: 8 °CJJ: 7 °CJA: 9 °CAS: 12 °CSO: 15 °CON: 19 °CND: 21 °CD23 °C

Heating degree-days here run 39% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 34/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
35/100environmental-severity index
15.2°Cseasonal temperature swing
67 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #10 largest wind power plant of 12 in Argentina by capacity.

Argentina has 12 wind power plants in this dataset, together about 212 MW of capacity.

Nearby power plants

Location

Coordinates -39.2291, -62.6497 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is MAYOR BURATOVICH?

MAYOR BURATOVICH is a 2 MW wind power plant in Buenos Aires, Argentina, commissioned in 2020.

Who operates MAYOR BURATOVICH?

MAYOR BURATOVICH is operated by COOPERATIVAS.

Built from open public data; no personal information. Operate this site? Request a correction or removal.