Home / Asia / United Arab Emirates / MADINET ZAYED

MADINET ZAYED

Other power plant in Emirate of Abu Dhabi, United Arab Emirates. Approximate location 23.5795, 53.7296.

OtherEmirate of Abu DhabiUnited Arab EmiratesCO₂ modelled

MADINET ZAYED is a 115 MW other power station in Emirate of Abu Dhabi, United Arab Emirates. Based on its capacity (estimated), it can supply roughly 86k homes (estimated). It ranks #52 of 60 United Arab Emirates power plants by installed capacity. Its modelled annual emissions are 315,410 t CO₂/yr (Climate TRACE), equivalent to about 74k cars driven for a year. In context, the national grid averages 468 gCO₂/kWh (31.7% low-carbon) (2024).

115Legacy source-record capacity
86,048homes powered (est.)
315,410t CO₂ / yr (Climate TRACE)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id CT-6530.

Data status

Known data

FacilityMADINET ZAYED Climate TRACE
CountryUnited Arab Emirates · Emirate of Abu Dhabi Climate TRACE
Coordinates23.5795, 53.7296 Climate TRACE
FuelOther Climate TRACE
MW installed capacity115 MW Climate TRACE source record; scope not independently normalised

Modelled source data

CO₂ emissions315,410 t CO₂/yr modelled · Climate TRACE

Calculated from dataset

Capacity rank in country#52 of 60 calculated
Fuel-specific rank in country#3 of 3 calculated
Homes-powered equivalent86,048 calculated
Climate27.7°C · HDD 2 derived from coordinates
Environmental severityC1 · 48/100 derived from coordinates

Not available

OwnerNot available not in dataset
CommissionedNot available not in dataset
TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.

capacity: Climate TRACE source-record capacity (modelled/legacy); fuel: Primary fuel not stated in available source record; classified as Other/industrial-mixed pending country registry match

In context: how this plant compares

This facility converts its energy source into electricity for the grid; its capacity, fuel type and location determine its role in the national power mix.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

~315,410 t CO₂/yr (modelled) — in everyday terms

This facility's annual emissions are roughly equivalent to:

74kpassenger cars driven for a year
41khomes' yearly energy use
5.3 milliontree seedlings grown 10 years to absorb it

Equivalencies via US EPA Greenhouse Gas Equivalencies; modelled emissions from Climate TRACE.

Capacity vs largest other plants in United Arab Emirates

Al Ain power station: 192 MW192Al Ain pow…DAS ISLAND LNG PLANT: 178 MW178DAS ISLAND…MADINET ZAYED: 115 MW115MADINET ZA…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Local climate & thermal context

This other plant generates electricity for the grid. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 23.6°N — which shapes how much energy it can produce and how its output varies through the year.

27.7°Cannual mean temp
2heating degree-days (base 18°C)
3,560cooling degree-days (base 18°C)
149 melevation

Monthly mean temperature

J: 18 °CJF: 20 °CFM: 23 °CMA: 28 °CAM: 32 °CMJ: 34 °CJJ: 36 °CJA: 36 °CAS: 33 °CSO: 29 °CON: 24 °CND: 20 °CD36 °C

Heating degree-days here run 100% below the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 13/100 — this site sits in the bottom third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.

C1ISO 9223 corrosivity (indicative)
48/100environmental-severity index
17.6°Cseasonal temperature swing
75 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #3 largest other power plant of 3 in United Arab Emirates by capacity.

United Arab Emirates has 3 other power plants in this dataset, together about 484 MW of capacity.

Nearby power plants

Location

Coordinates 23.5795, 53.7296 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is MADINET ZAYED?

MADINET ZAYED is a 115 MW source-record other power plant in Emirate of Abu Dhabi, United Arab Emirates.

How many homes can MADINET ZAYED power?

Its output is enough to supply roughly 86,048 homes (estimated).

How much CO₂ does MADINET ZAYED emit?

MADINET ZAYED has modelled emissions of about 315,410 tonnes of CO₂ per year (Climate TRACE).

Built from open public data; no personal information. Operate this site? Request a correction or removal.