Solar power plant in England, United Kingdom. Approximate location 52.7904, 0.1359.

SolarEnglandUnited Kingdom

Long Sutton Butterfly And Wildlife Park (extension) is a 1 MW solar power plant in England, United Kingdom. It is operated by Moor Solar. Based on its capacity (estimated), it can supply roughly 425 homes (estimated). It ranks #2814 of 2,860 United Kingdom power plants by installed capacity. As a non-combustion source, it has no direct CO₂ emissions from generation. In context, solar supplies about 6.6% of United Kingdom's electricity; the national grid averages 217 gCO₂/kWh (64.4% low-carbon) (2025).

1Source-backed capacity
425homes powered (est.)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id GBR0001050.

Data status

Known data

FacilityLong Sutton Butterfly And Wildlife Park (extension) WRI
CountryUnited Kingdom · England WRI
Coordinates52.7904, 0.1359 WRI
FuelSolar WRI
MW installed capacity1 MW WRI source record; scope not independently normalised
OwnerMoor Solar WRI

Calculated from dataset

Capacity rank in country#2814 of 2860 calculated
Fuel-specific rank in country#1155 of 1170 calculated
Capacity vs country/fuel peers0.20× · 5 MW median · 1170 peers calculated
Homes-powered equivalent425 calculated
Climate9.7°C · HDD 3,029 derived from coordinates
Environmental severityC4 · 30/100 derived from coordinates

Not available

CommissionedNot available not in dataset
TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset
CO₂ emissionsnot applicable not applicable

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Capacity provenance

The public capacity above is the current source-record value. A 2026 tracker candidate lists 3 MW for Long Sutton Butterfly And Wildlife Park , but it is not used as the public primary value until scope is verified (unit vs operating vs installed/project total).

Capacity claim grade: B_SCOPE_PARENT_COMPLEX - recommended action: build_parent_complex_model - confidence: not_comparable_without_scope. This follows a claim-based data model: value + scope + source + confidence, rather than silently overwriting records.

Data provenance

The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.

capacity: GEM tracker 2026 (location L100000825924); fuel: WRI source-record fuel

In context: how this plant compares

At 1 MW, Long Sutton Butterfly And Wildlife Park (extension) is below the median solar plant in United Kingdom (5 MW). Solar PV converts sunlight directly into electricity with no moving parts or fuel; output varies by time of day and weather, so it pairs with storage or flexible backup.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest solar plants in United Kingdom

Shotwick: 72 MW72ShotwickMOD Lyneham: 70 MW70MOD LynehamWest Raynham: 50 MW50West Raynh…Snarlton Farm (Melksham solar farm): 50 MW50Snarlton F…Eveley: 49 MW49EveleyOwl's Hatch Solar Park: 48 MW48Owl's Hatc…Southwick Estate: 48 MW48Southwick …Landmead Farm (East Hanney): 46 MW46Landmead F…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Moor Solar.

Local climate & thermal context

This solar plant converts sunlight directly into electricity with photovoltaic panels. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 52.8°N — which shapes how much energy it can produce and how its output varies through the year.

9.7°Cannual mean temp
3,029heating degree-days (base 18°C)
0cooling degree-days (base 18°C)
3 melevation

Monthly mean temperature

J: 4 °CJF: 4 °CFM: 6 °CMA: 8 °CAM: 11 °CMJ: 14 °CJJ: 16 °CJA: 16 °CAS: 14 °CSO: 11 °CON: 7 °CND: 5 °CD16 °C

Heating degree-days here run 23% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 63/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Solar PV loses ~0.35%/°C above 25°C cell temperature — roughly 0.0% at warm-season highs here (estimate).

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
30/100environmental-severity index
12.7°Cseasonal temperature swing
46 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #1155 largest solar power plant of 1170 in United Kingdom by capacity.

United Kingdom has 1170 solar power plants in this dataset, together about 8,703 MW of capacity.

Nearby power plants

Location

Coordinates 52.7904, 0.1359 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Long Sutton Butterfly And Wildlife Park (extension)?

Long Sutton Butterfly And Wildlife Park (extension) is a 1 MW source-record solar power plant in England, United Kingdom.

How many homes can Long Sutton Butterfly And Wildlife Park (extension) power?

Its output is enough to supply roughly 425 homes (estimated).

Who operates Long Sutton Butterfly And Wildlife Park (extension)?

Long Sutton Butterfly And Wildlife Park (extension) is operated by Moor Solar.

Built from open public data; no personal information. Operate this site? Request a correction or removal.