Jamshoro power station is a 880 MW gas power station in Sindh, Pakistan. It is operated by Jamshoro Power Co Ltd [100%]. Based on its capacity (estimated), it can supply roughly 991k homes (estimated). It ranks #26 of 122 Pakistan power plants by installed capacity. Commissioned in 1989, it is around 37 years old — long-established. In context, gas supplies about 21.0% of Pakistan's electricity; the national grid averages 347 gCO₂/kWh (54.9% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id GOGPT_jamshoro_pakist.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and/or fuel fields on this page include a source-backed provenance label from GEM, an official registry, Wikidata, OSM, or a cross-source match.
capacity: Wikidata P2109; fuel: GEM GOGPT
At 880 MW, Jamshoro power station is well above the median gas plant in Pakistan (227 MW). Technically it is described as Steam. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Jamshoro Power Co Ltd [100%].
This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 25.5°N — which shapes how much energy it can produce and how its output varies through the year.
Climate zone & typical temperatures: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a benign, low-corrosion environment (estimated ISO 9223 class C1 — Very low), with dust abrasion the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #8 largest gas power plant of 31 in Pakistan by capacity.
Pakistan has 31 gas power plants in this dataset, together about 15,945 MW of capacity.
Coordinates 25.472222, 68.266111 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
Jamshoro power station is a 880 MW gas power plant in Sindh, Pakistan, commissioned in 1989.
Its output is enough to supply roughly 991,131 homes (estimated).
Jamshoro power station is operated by Jamshoro Power Co Ltd [100%].