Home / Asia / Pakistan / Hub Power Project

Hub Power Project — Pakistan

Oil power plant in Balochistan, Pakistan. Approximate location 24.9057, 66.6946.

OilBalochistanPakistanSteam

Hub Power Project is a 1,292 MW oil power station in Balochistan, Pakistan. It is operated by Hub Power Company. Based on its capacity (estimated), it can supply roughly 970k homes (estimated). It ranks #19 of 122 Pakistan power plants by installed capacity. Commissioned in 1977, it is around 49 years old — long-established. In context, oil supplies about 9.2% of Pakistan's electricity; the national grid averages 347 gCO₂/kWh (54.9% low-carbon) (2025).

1,292MW installed capacity
970,107homes powered (est.)
1977commissioned (~49 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1001627.

Data status

Known data

FacilityHub Power Project WRI
CountryPakistan · Balochistan WRI
Coordinates24.9057, 66.6946 WRI
FuelOil WRI
MW installed capacity1,292 MW GEM · 2026 · L100000408404; operating plant capacity
Verification noteQuality label backfilled from existing source-backed capacity provenance on 2026-07-05; capacity value was not changed. source-verified
OwnerHub Power Company WRI
Commissioned1977 WRI
TechnologySteam WRI

Calculated from dataset

CO₂ emissions2,546,532 t CO₂·a⁻¹ calculated
Capacity rank in country#19 / 122 calculated
Fuel-specific rank in country#1 / 19 calculated
Capacity vs country/fuel peers6.95× · 185.9 MW · n=19 calculated
Homes-powered equivalent970,107 calculated
Climate25.9°C · HDD 0 derived from coordinates
Environmental severityC5 · 61/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

Source of the capacity and fuel values:

capacity: GEM · 2026 · L100000408404; fuel: WRI GPPD

In context: how this plant compares

At 1,292 MW, Hub Power Project is well above the median oil plant in Pakistan (185.9 MW). Technically it is described as Steam. Oil-fired plants burn heavy fuel oil or diesel, usually as peaking or backup capacity on islands and grids without gas pipelines; high fuel cost keeps their utilisation low.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Key facts

Share of Pakistan oil capacity
23.1% of 5,584 MW across 19 plants in this dataset
Age among peers
0 of 17 dated oil plants in Pakistan are older

Calculated from the capacity and generation records in this dataset (WRI Global Power Plant Database (CC BY 4.0)).

Capacity vs largest oil plants in Pakistan

Hub Power Project: 1,292 MW1kHub Power …Bin Qasim: 1,260 MW1kBin QasimPak Gen (Pvt) Limited: 365 MW365Pak Gen (P…AES Lalpir Ltd. Mahmood Kot Muzaffargarh: 362 MW362AES Lalpir…Hub Power Project- Narowal: 220 MW220Hub Power …Narowal power plant: 202 MW202Narowal po…Piranghaib Multan: 192 MW192Piranghaib…Nishat Chunian Limited: 186 MW186Nishat Chu…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Hub Power Company.

Local climate & thermal context

This oil plant burns oil or diesel to drive turbines or reciprocating engines. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 24.9°N — which shapes how much energy it can produce and how its output varies through the year.

25.9°Cannual mean temp
0heating degree-days (base 18°C)
2,893cooling degree-days (base 18°C)
40 melevation

Monthly mean temperature

J: 18 °CJF: 20 °CFM: 24 °CMA: 28 °CAM: 30 °CMJ: 31 °CJJ: 30 °CJA: 29 °CAS: 29 °CSO: 28 °CON: 24 °CND: 20 °CD31 °C

This site has effectively no heating season (tropical/equatorial climate), so winter heat loss is not the driver here. The thermal concern shifts to year-round process heat and humidity/heat-driven corrosion of hot equipment.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
61/100environmental-severity index
12.9°Cseasonal temperature swing
18 kmdistance to coast

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #1 largest oil power plant of 19 in Pakistan by capacity.

Pakistan has 19 oil power plants in this dataset, together about 5,584 MW of capacity.

Nearby power plants

Location

Coordinates 24.9057, 66.6946 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Hub Power Project?

Hub Power Project is a 1,292 MW oil power plant in Balochistan, Pakistan, commissioned in 1977.

Who operates Hub Power Project?

Hub Power Project is operated by Hub Power Company.