EC Miechowice is a 125 MW coal power station in Silesian Voivodeship, Poland. It is operated by Zespół Elektrociepłowni Bytom. Based on its capacity (estimated), it can supply roughly 156k homes (estimated). It ranks #89 of 246 Poland power plants by installed capacity. Commissioned in 1954, it is around 72 years old — an older, legacy facility. Its modelled annual emissions are 48,566 t CO₂/yr (Climate TRACE), equivalent to about 11k cars driven for a year. In context, coal supplies about 50.4% of Poland's electricity; the national grid averages 589 gCO₂/kWh (31.5% low-carbon) (2025).
Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1061522.
Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.
The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.
capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel
At 125 MW, EC Miechowice is below the median coal plant in Poland (166 MW). Technically it is described as subcritical. Coal plants burn pulverised coal to raise high-pressure steam for a turbine; they run as baseload but are the most carbon-intensive mainstream source and the first targeted for retirement or efficiency retrofits.
Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.
This facility's annual emissions are roughly equivalent to:
Equivalencies via US EPA Greenhouse Gas Equivalencies; modelled emissions from Climate TRACE.
Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).
Operated by Zespół Elektrociepłowni Bytom.
This coal plant burns coal to raise high-pressure steam that spins a turbine-generator. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 50.3°N — which shapes how much energy it can produce and how its output varies through the year.
Monthly mean temperature
Heating degree-days here run 42% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.
Climate heat-demand index: 76/100 — this site sits in the top third of the power plants we cover by heating degree-days.
Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.
For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
The #51 largest coal power plant of 93 in Poland by capacity.
Poland has 93 coal power plants in this dataset, together about 47,959 MW of capacity.
Coordinates 50.3488, 18.8419 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.
EC Miechowice is a 125 MW source-record coal power plant in Silesian Voivodeship, Poland, commissioned in 1954.
Its output is enough to supply roughly 156,428 homes (estimated).
EC Miechowice is operated by Zespół Elektrociepłowni Bytom.
EC Miechowice has modelled emissions of about 48,566 tonnes of CO₂ per year (Climate TRACE).