Home / Europe / United Kingdom / Bletchley Phase II

Bletchley Phase II

Waste power plant in England, United Kingdom. Approximate location 51.9791, -0.7653.

WasteEnglandUnited Kingdom

Bletchley Phase II is a 2 MW waste power plant in England, United Kingdom. It is operated by Waste Recycling Group. Based on its capacity (estimated), it can supply roughly 3.0k homes (estimated). It ranks #2299 of 2,860 United Kingdom power plants by installed capacity. In context, the national grid averages 217 gCO₂/kWh (64.4% low-carbon) (2025).

2Legacy source-record capacity
3,028homes powered (est.)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id GBR0000536.

Data status

Known data

FacilityBletchley Phase II WRI
CountryUnited Kingdom · England WRI
Coordinates51.9791, -0.7653 WRI
FuelWaste WRI
MW installed capacity2 MW WRI source record; scope not independently normalised
OwnerWaste Recycling Group WRI

Calculated from dataset

Capacity rank in country#2299 of 2860 calculated
Fuel-specific rank in country#174 of 329 calculated
Capacity vs country/fuel peers0.96× · 2 MW median · 329 peers calculated
Homes-powered equivalent3,028 calculated
Climate9.9°C · HDD 2,951 derived from coordinates
Environmental severityC3 · 26/100 derived from coordinates

Not available

CommissionedNot available not in dataset
TechnologyNot available not in dataset
GWh reported / yrNot available not in dataset
CO₂ emissionsNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.

capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel

In context: how this plant compares

At 2 MW, Bletchley Phase II is around the median waste plant in United Kingdom (2 MW). Waste-to-energy plants burn municipal solid waste to generate electricity and heat, cutting landfill volume while recovering energy from residual waste.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest waste plants in United Kingdom

Runcorn EfW: 81 MW81Runcorn EfWRiverside Resource Recovery Facility (RRRF): 72 MW72Riverside …Edmonton: 60 MW60EdmontonAllington EFW: 51 MW51Allington …Fibrepower Slough: 50 MW50Fibrepower…K3 CHP Facility (Kemsley EfW): 50 MW50K3 CHP Fac…Wilton 11 EfW: 49 MW49Wilton 11 …Lakeside EfW: 37 MW37Lakeside E…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Waste Recycling Group. All plants by this company →

Local climate & thermal context

This waste plant recovers energy by combusting municipal or industrial waste. It sits in a temperate oceanic climate (Köppen Cfb) — Northern Hemisphere, latitude 52.0°N — which shapes how much energy it can produce and how its output varies through the year.

9.9°Cannual mean temp
2,951heating degree-days (base 18°C)
0cooling degree-days (base 18°C)
110 melevation

Monthly mean temperature

J: 4 °CJF: 4 °CFM: 6 °CMA: 8 °CAM: 12 °CMJ: 15 °CJJ: 17 °CJA: 17 °CAS: 14 °CSO: 10 °CON: 7 °CND: 5 °CD17 °C

Heating degree-days here run 20% above the median power plant in this dataset — a proxy for how much extra energy heated equipment must replace through its surfaces in winter.

Climate heat-demand index: 61/100 — this site sits in the mid third of the power plants we cover by heating degree-days.

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
26/100environmental-severity index
12.9°Cseasonal temperature swing
125 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #174 largest waste power plant of 329 in United Kingdom by capacity.

United Kingdom has 329 waste power plants in this dataset, together about 1,886 MW of capacity.

Nearby power plants

Location

Coordinates 51.9791, -0.7653 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is Bletchley Phase II?

Bletchley Phase II is a 2 MW source-record waste power plant in England, United Kingdom.

How many homes can Bletchley Phase II power?

Its output is enough to supply roughly 3,028 homes (estimated).

Who operates Bletchley Phase II?

Bletchley Phase II is operated by Waste Recycling Group.

Built from open public data; no personal information. Operate this site? Request a correction or removal.