APC UAN

Gas power plant in Abu Dhabi, United Arab Emirates. Approximate location 24.4375, 54.491.

GasAbu DhabiUnited Arab EmiratesCCGT · HRSGGE Power: 935IFA

APC UAN is a 2,430 MW gas power station in Abu Dhabi, United Arab Emirates. It is operated by Arabian power Company ADWEA IPR TEPCO and Mitsui. Based on its capacity (estimated), it can supply roughly 2.7 million homes (estimated). It ranks #7 of 60 United Arab Emirates power plants by installed capacity. Commissioned in 2003, it is around 23 years old — relatively modern. In context, gas supplies about 68.3% of United Arab Emirates's electricity; the national grid averages 468 gCO₂/kWh (31.7% low-carbon) (2024).

2,430Legacy source-record capacity
1HRSG unit(s)
2,736,874homes powered (est.)
2003commissioned (~23 yrs)

Plant data: WRI Global Power Plant Database (CC BY 4.0), id WRI1008747.

Data status

Known data

FacilityAPC UAN WRI
CountryUnited Arab Emirates · Abu Dhabi WRI
Coordinates24.4375, 54.491 WRI
FuelGas WRI
MW installed capacity2,430 MW WRI source record; scope not independently normalised
OwnerArabian power Company ADWEA IPR TEPCO and Mitsui WRI
Commissioned2003 WRI
TechnologyCCGT · GE Power: 935IFA · HRSG WRI

Calculated from dataset

CO₂ emissions3,831,624 t CO₂/yr calculated
Capacity rank in country#7 of 60 calculated
Fuel-specific rank in country#6 of 44 calculated
Capacity vs country/fuel peers2.51× · 969 MW median · 44 peers calculated
Homes-powered equivalent2,736,874 calculated
Climate27.7°C · HDD 0 derived from coordinates
Environmental severityC5 · 64/100 derived from coordinates

Not available

GWh reported / yrNot available not in dataset

Known, modelled and calculated values are kept separate. Missing fields are shown as unavailable.

Data provenance

The capacity and fuel fields on this page are source-record values from the upstream open dataset. They are useful for identification and ranking, but they have not been upgraded to a 2026 registry/GEM-location verified value.

capacity: WRI Global Power Plant Database source-record (legacy); fuel: WRI source-record fuel

In context: how this plant compares

At 2,430 MW, APC UAN is well above the median gas plant in United Arab Emirates (969 MW). Technically it is described as CCGT; combined-cycle with a heat-recovery steam generator (HRSG); GE Power: 935IFA. Gas plants burn natural gas either in open-cycle turbines for fast peaking, or in combined-cycle units that recover exhaust heat in an HRSG to reach roughly 55–62% efficiency — the cleanest-burning fossil option.

Capacity comparison computed from the WRI Global Power Plant Database; fuel-type context is general engineering background.

Capacity vs largest gas plants in United Arab Emirates

Shuweihat S1: 4,889 MW5kShuweihat …Emirates Aluminum Smelter Complex power station: 3,440 MW3kEmirates A…Al-Nouf Power Plant: 3,300 MW3kAl-Nouf Po…Emirates Global Aluminum Smelter power station: 2,718 MW3kEmirates G…Taweelah C Independent Power Producer (IPP): 2,500 MW2kTaweelah C…APC UAN: 2,430 MW2kAPC UANHassyan Clean-Coal Power Project: 2,400 MW2kHassyan Cl…Fujairah F3 Integrated Water and power plant: 2,400 MW2kFujairah F…

Installed capacity (MW), WRI Global Power Plant Database (CC BY 4.0).

Owner

Operated by Arabian power Company ADWEA IPR TEPCO and Mitsui.

Local climate & thermal context

This gas plant burns natural gas in a turbine — often in a combined-cycle setup — to generate electricity. It sits in a hot desert climate (Köppen BWh) — Northern Hemisphere, latitude 24.4°N — which shapes how much energy it can produce and how its output varies through the year.

27.7°Cannual mean temp
0heating degree-days (base 18°C)
3,558cooling degree-days (base 18°C)
5 melevation

Monthly mean temperature

J: 19 °CJF: 20 °CFM: 23 °CMA: 27 °CAM: 32 °CMJ: 34 °CJJ: 35 °CJA: 35 °CAS: 33 °CSO: 29 °CON: 25 °CND: 21 °CD35 °C

This site has effectively no heating season (tropical/equatorial climate), so winter heat loss is not the driver here. The thermal concern shifts to year-round process heat and humidity/heat-driven corrosion of hot equipment.

A gas turbine here also runs ~9% below its ISO (15°C) rating at this annual mean (typical CCGT curve, estimate).

Climate normals: WorldClim 2.1 (1970–2000 monthly normals, 10 arc-min, CC BY 4.0); zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid). Degree-days & heat-demand index computed by PowerAtlas — a modelled heat-demand proxy, not a measured site figure.

Site climate & environmental severity

For a plant’s outdoor hardware — heat-recovery steam generators (HRSG), expansion joints, valves, flanges and their insulation — the local climate sets how fast unprotected steel and coatings degrade. This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
64/100environmental-severity index
16.7°Cseasonal temperature swing
32 kmdistance to coast

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby plants

The #6 largest gas power plant of 44 in United Arab Emirates by capacity.

United Arab Emirates has 44 gas power plants in this dataset, together about 57,334 MW of capacity.

Nearby power plants

Location

Coordinates 24.4375, 54.491 from WRI Global Power Plant Database (CC BY 4.0). View on OpenStreetMap.

Frequently asked questions

What type of power plant is APC UAN?

APC UAN is a 2,430 MW source-record gas power plant in Abu Dhabi, United Arab Emirates, commissioned in 2003.

How many homes can APC UAN power?

Its output is enough to supply roughly 2,736,874 homes (estimated).

Who operates APC UAN?

APC UAN is operated by Arabian power Company ADWEA IPR TEPCO and Mitsui.