Coal power-plant records in Bosnia and Herzegovina
11 source records with 4,730 MW of listed capacity. This is not current national installed capacity.
Source records and lifecycle
The directory combines historical WRI records and GEM coal records. A capacity value does not confirm that a station was built or is operating. Unknown means the retained record has no lifecycle label; operating labels shown here are source labels, not a new site verification.
| Source record | Listed MW | Lifecycle label | Dataset label |
|---|---|---|---|
| Tuzla CHP Power Plant Bosnia and Herzegovina | 730 | Operating | WRI |
| Bugojno Thermal Power Project | 600 | Cancelled project | GEM-coal |
| Kongora Thermal Power Plant | 550 | Cancelled project | GEM-coal |
| Glinica power station | 500 | Cancelled project | GEM-coal |
| Kakanj CHP Power Plant Bosnia and Herzegovina | 450 | Unknown | WRI |
| Kamengrad Thermal Power Plant | 430 | Cancelled project | GEM-coal |
| Banovici power station | 350 | Cancelled project | GEM-coal |
| Gacko Coal CHP Power Plant Bosnia and Herzegovina | 300 | Operating | WRI |
| Ugljevik CHP Coal Power Plant Bosnia and Herzegovina | 300 | Operating | WRI |
| Stanari Thermal Power Plant | 300 | Operating | GEM-coal |
| Miljevina power station | 220 | Cancelled — historical category | GEM-coal |
Bugojno's 600 MW is proposed capacity from two 300 MW units, both listed as cancelled by Global Energy Monitor. It is not operating capacity. Other capacity values retain the source-record scope; this table is not a verified total for operating coal stations.
Historical capacity and unit status
Tuzla's 730 MW is the historical WRI record value. GEM's unit table labels coal units 4, 5 and 6 operating, totalling 640 MW, and unit 3 mothballed. These different source scopes are not interchangeable.
Kongora, Glinica, Kamengrad and Banovici are cancelled projects in the linked GEM unit tables. Miljevina's two 110 MW units appear as cancelled in a historical category table. That category is not a current national fleet inventory. Proposed expansions and changes of fuel at existing stations are not added to the retained WRI capacity.
Methodology and sources · All Bosnia and Herzegovina records