Steel PlantCanadaCO₂ estimate (modelled)
Rio Tinto Fer et Titane steel plant is a steel plant in Canada. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels. It is operated by Rio Tinto Iron and Titanium Canada Inc. It emits about 673,836 t CO₂e a year from Climate TRACE. That is 0.96% of the CO₂e from the 127 facilities in Canada that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566475.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Devki Steel Mills Kwale plant · 671,416 t CO₂e/yr · Kenya
- Mobarakeh Steel Sefid Dasht Steel Complex · 661,303 t CO₂e/yr · Iran
- Neyriz Ghadir Steel Company Fars plant · 661,303 t CO₂e/yr · Iran
- Natanz Steel Company Isfahan plant · 660,642 t CO₂e/yr · Iran
- Solb Steel Jizan plant · 654,665 t CO₂e/yr · Saudi Arabia
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- St-Thomas · Biomass · 9 MW · 9 km
- Pierre-De Saurel · Wind · 25 MW · 18 km
- Centrale Lefrançois · Hydro · 8 MW · 44 km
- Rawdon · Hydro · 2 MW · 45 km
- Lachenaie Landfill · Biomass · 4 MW · 46 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: iron-and-steel. As steel plant, it requires high process heat (typically 800–1500°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 673,836 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 674k t CO₂e/yr (Scope 1), Rio Tinto Fer et Titane steel plant carries no domestic carbon price — and as a CBAM-covered product, its 674k t at the EU CBAM rate (€75/t) is €50.8M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Rio Tinto Iron and Titanium Canada Inc.
Local climate
Rio Tinto Fer et Titane steel plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 46.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with thermal cycling the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1446 W/m² to ambient — roughly 1.11× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Joliette Cement Plant · Cement Plant · 281,008 t CO₂
- ArcelorMittal Montreal steel plant · Steel Plant · 933,302 t CO₂
- Usine De Joliette · Lime Plant · 45,930 t CO₂
- Suncor Montreal Refinery · Refinery · 1,870,058 t CO₂
- Montreal Plant (024) · Other Manufacturing · 37,187 t CO₂
- Bécancour aluminium plant · Aluminium Smelter · 877,682 t CO₂
Location
Coordinates 46.04335, -73.14177. View on OpenStreetMap.
Frequently asked questions
What type of facility is Rio Tinto Fer et Titane steel plant?
Rio Tinto Fer et Titane steel plant is a steel plant in Canada. Steel plants burn coal in blast furnaces or use electric arcs to melt scrap; in both cases the molten metal must be kept above 1,500°C and transferred through extensive hot piping and vessels.
How much CO₂ does Rio Tinto Fer et Titane steel plant emit?
The page uses about 673,836 t CO₂e/year from the open dataset It ranks #33 among facilities in Canada by estimated CO₂.
Where is Rio Tinto Fer et Titane steel plant located?
Rio Tinto Fer et Titane steel plant is in Canada at approximately 46.04335, -73.14177.
Who operates Rio Tinto Fer et Titane steel plant?
The operator recorded in the open dataset is Rio Tinto Iron and Titanium Canada Inc.