Home / Oceania / Australia / Cement plants / New Berrima Cement Plant

New Berrima Cement Plant

Cement Plant in Australia. Approximate location -34.51014, 150.33322.

Cement PlantAustraliaCO₂ estimate (modelled)

New Berrima Cement Plant is a cement plant in Australia. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Boral Cement Ltd. It emits about 292,619 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 68k passenger cars.

292,619t CO₂e / yr (Climate TRACE)
#23CO₂ rank in Australia

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895142.

Data status

Known source data

FacilityNew Berrima Cement Plant Climate TRACE
CountryAustralia Climate TRACE
Coordinates-34.51014, 150.33322 Climate TRACE
Sector / subsectorcement Climate TRACE
Owner / operatorBoral Cement Ltd Climate TRACE
Modelled CO₂e292,619 t/yr Climate TRACE

Calculated from the dataset

Australia rank#23 of 30 · top 76.7% calculated
Global cement rank#1663 of 2113 · top 78.7% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 292,619 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

68kcars driven for a year
38khomes' annual energy use
4.9 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 293k t CO₂e/yr (Scope 1), New Berrima Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 293k t at the EU CBAM rate (€75/t) is €22.1M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈6k t–15k t/yr, worth €441k€1.1M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

293k t CO₂e / yrScope 1 emissions
€22.1M/yrCBAM exposure on EU exports
6k t–15k t/yr ≈ €441k€1.1MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Operator

Operated by Boral Cement Ltd.

Local climate

New Berrima Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 34.5°S in the southern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
39/100environmental-severity index
10.6°Cseasonal temperature swing
46 kmdistance to coast
HighCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1346 W/m² to ambient — roughly 1.03× the loss at a 20 °C reference; removable insulation recovers about 1279 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates -34.51014, 150.33322. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 9,000 MWh/year of recoverable heat-loss reduction and about 3,100 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is New Berrima Cement Plant?

New Berrima Cement Plant is a cement plant in Australia. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

How much CO₂ does New Berrima Cement Plant emit?

The page uses about 292,619 t CO₂e/year from the open dataset It ranks #23 among facilities in Australia by estimated CO₂.

Where is New Berrima Cement Plant located?

New Berrima Cement Plant is in Australia at approximately -34.51014, 150.33322.

Who operates New Berrima Cement Plant?

The operator recorded in the open dataset is Boral Cement Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.