Home / Oceania / Australia / Cement plants / New Berrima Cement Plant

New Berrima Cement Plant — Australia

Cement Plant in Australia. Approximate location -34.51014, 150.33322.

Cement PlantAustraliaCO₂ estimate (modelled)

New Berrima Cement Plant is a cement plant in Australia. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Boral Cement Ltd. It emits about 292,619 t CO₂e a year from Climate TRACE. That is 0.65% of the CO₂e from the 30 facilities in Australia that have an emissions figure in IndustryAtlas.

292,619t CO₂e / yr (Climate TRACE)
#23CO₂ rank in Australia

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1895142.

Data status

Known source data

FacilityNew Berrima Cement Plant Climate TRACE
CountryAustralia Climate TRACE
Coordinates-34.51014, 150.33322 Climate TRACE
Sector / subsectorcement Climate TRACE
Owner / operatorBoral Cement Ltd Climate TRACE
Modelled CO₂e292,619 t/yr Climate TRACE

Calculated from the dataset

Australia rank#23 of 30 · top 76.7% calculated
Global cement rank#1663 of 2113 · top 78.7% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 292,619 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

1.6krailcars of coal burned
61khomes' electricity use for a year
293kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 293k t CO₂e/yr (Scope 1), New Berrima Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 293k t at the EU CBAM rate (€75/t) is €22.1M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

293k t CO₂e / yrScope 1 emissions
€22.1M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Operator

Operated by Boral Cement Ltd.

Local climate

New Berrima Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 34.5°S in the southern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a corrosive environment (estimated ISO 9223 class C4 — High), with humidity / wetness the leading environmental stress.

C4ISO 9223 corrosivity (indicative)
39/100environmental-severity index
10.6°Cseasonal temperature swing
46 kmdistance to coast
HighCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1346 W/m² to ambient — roughly 1.03× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates -34.51014, 150.33322. View on OpenStreetMap.

Frequently asked questions

What type of facility is New Berrima Cement Plant?

New Berrima Cement Plant is a cement plant in Australia. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

How much CO₂ does New Berrima Cement Plant emit?

The page uses about 292,619 t CO₂e/year from the open dataset It ranks #23 among facilities in Australia by estimated CO₂.

Where is New Berrima Cement Plant located?

New Berrima Cement Plant is in Australia at approximately -34.51014, 150.33322.

Who operates New Berrima Cement Plant?

The operator recorded in the open dataset is Boral Cement Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.