Arrigorriaga Cement Plant — Spain
Cement Plant in Spain. Approximate location 43.20499, -2.90014.
Cement PlantSpainCO₂ estimate (modelled)
Arrigorriaga Cement Plant is a cement plant in Spain. Its listed capacity is 1,125,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Heidelberg Materials Hispania Cementos SA. By capacity it ranks #11 among 20 cement plants in Spain. It emits about 291,876 t CO₂e a year from Climate TRACE. That is 0.61% of the CO₂e from the 91 facilities in Spain that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 28% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32438406.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Max Cement Nay Pyi Taw Cement Plant · 291,889 t CO₂e/yr · Myanmar
- Gezhouba Shieli Cement Plant · 291,861 t CO₂e/yr · Kazakhstan
- New Berrima Cement Plant · 292,619 t CO₂e/yr · Australia
- Montcada i Reixac Cement Plant · 290,693 t CO₂e/yr · Spain
- Kinnegad Cement Plant · 293,265 t CO₂e/yr · Ireland
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Zabalgarbi power station · Waste · 96 MW · 8 km
- AMOREBIETA · Gas · 786 MW · 13 km
- BARAZAR 1 · Hydro · 83 MW · 17 km
- CT SANTURCE 2 · Oil · 897 MW · 20 km
- SANTURCE GRUPO 4 · Gas · 396 MW · 20 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 1,125,000 t of cement, Arrigorriaga Cement Plant is around the median cement plant in Spain (1,250,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 291,876 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 292k t CO₂e/yr (Scope 1), Arrigorriaga Cement Plant carries €24.9M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Spain
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Heidelberg Materials Hispania Cementos SA. All facilities by this operator →
Local climate
Arrigorriaga Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 43.2°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1365 W/m² to ambient — roughly 1.05× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #11 largest of 20 cement plants in Spain by listed capacity (Climate TRACE).
Nearby industrial sites
- Sidenor Aceros Especiales Basauri steel plant · Steel Plant · 34,497 t CO₂
- Lemona Cement Plant · Cement Plant · 215,109 t CO₂
- ArcelorMittal Sestao steel plant · Steel Plant · 315,452 t CO₂
- Celsa Nervacero steel plant · Steel Plant · 46,617 t CO₂
- Unilever Foods España, S.A. (Unilever Foods España, S.A.) · Food & Beverage
- ALCOA TRANSFORMACION DE PRODUCTOS, S.L. (ALCOA TRANSFORMACIÓN DE PRODUCTOS, S.L.) · Metals Plant · 368,000 t CO₂
Location
Coordinates 43.20499, -2.90014. View on OpenStreetMap.
Frequently asked questions
What type of facility is Arrigorriaga Cement Plant?
Arrigorriaga Cement Plant is a cement plant in Spain. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Arrigorriaga Cement Plant?
The open dataset lists 1,125,000 t of cement of capacity for Arrigorriaga Cement Plant.
How much CO₂ does Arrigorriaga Cement Plant emit?
The page uses about 291,876 t CO₂e/year from the open dataset It ranks #40 among facilities in Spain by estimated CO₂.
Where is Arrigorriaga Cement Plant located?
Arrigorriaga Cement Plant is in Spain at approximately 43.20499, -2.90014.
Who operates Arrigorriaga Cement Plant?
The operator recorded in the open dataset is Heidelberg Materials Hispania Cementos SA.