Montcada i Reixac Cement Plant — Spain
Cement Plant in Spain. Approximate location 40.00678, -3.89866.
Cement PlantSpainCO₂ estimate (modelled)
Montcada i Reixac Cement Plant is a cement plant in Spain. Its listed capacity is 900,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Holcim España SAU. By capacity it ranks #15 among 20 cement plants in Spain. It emits about 290,693 t CO₂e a year from Climate TRACE. That is 0.61% of the CO₂e from the 91 facilities in Spain that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 11% below the national median for this sector.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896732.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- Gezhouba Shieli Cement Plant · 291,861 t CO₂e/yr · Kazakhstan
- Arrigorriaga Cement Plant · 291,876 t CO₂e/yr · Spain
- Max Cement Nay Pyi Taw Cement Plant · 291,889 t CO₂e/yr · Myanmar
- New Berrima Cement Plant · 292,619 t CO₂e/yr · Australia
- Malabar Cements Walayar Cement Plant · 288,453 t CO₂e/yr · India
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- ACECA GRUPO 4 · Gas · 759 MW · 8 km
- Bargas · Solar · 5 MW · 21 km
- Peninsular de Cogeneracion Mill power station · Gas · 54 MW · 31 km
- Villaverde · Solar · 5 MW · 35 km
- LAS PICADAS GRUPO 1 · Hydro · 24 MW · 44 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
At 900,000 t of cement, Montcada i Reixac Cement Plant is below the median cement plant in Spain (1,250,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 290,693 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 291k t CO₂e/yr (Scope 1), Montcada i Reixac Cement Plant carries €24.8M/yr of carbon at the full EU ETS price (€85/t CO₂). Free allocation phases out to 2034 (Reg. (EU) 2023/956), so today's bill is lower and rising toward this full-price figure.
Carbon price: EU ETS €85/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Capacity vs largest cement plants in Spain
Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operator
Operated by Holcim España SAU. All facilities by this operator →
Local climate
Montcada i Reixac Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 40.0°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1347 W/m² to ambient — roughly 1.04× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
The #15 largest of 20 cement plants in Spain by listed capacity (Climate TRACE).
Nearby industrial sites
- Castillejo Cement Plant · Cement Plant · 601,237 t CO₂
- Incoas, S.A.(Industrias Correctoras Asociadas, S.A.) · Food & Beverage
- Matadero Comaran · Food & Beverage
- Avícola Moraleja, S.A. · Food & Beverage
- La Casa De La Carne, S.A.U. · Food & Beverage
- Explotaciones Avicolas Jose Luis Redondo S.A. · Food & Beverage
Location
Coordinates 40.00678, -3.89866. View on OpenStreetMap.
Frequently asked questions
What type of facility is Montcada i Reixac Cement Plant?
Montcada i Reixac Cement Plant is a cement plant in Spain. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
What capacity is listed for Montcada i Reixac Cement Plant?
The open dataset lists 900,000 t of cement of capacity for Montcada i Reixac Cement Plant.
How much CO₂ does Montcada i Reixac Cement Plant emit?
The page uses about 290,693 t CO₂e/year from the open dataset It ranks #41 among facilities in Spain by estimated CO₂.
Where is Montcada i Reixac Cement Plant located?
Montcada i Reixac Cement Plant is in Spain at approximately 40.00678, -3.89866.
Who operates Montcada i Reixac Cement Plant?
The operator recorded in the open dataset is Holcim España SAU.
