Home / Europe / Bosnia and Herzegovina / Cement plants / Kakanj Cement Plant

Kakanj Cement Plant — Bosnia and Herzegovina

Cement Plant in Bosnia and Herzegovina. Approximate location 44.11704, 18.11278.

Cement PlantBosnia and HerzegovinaCO₂ estimate (modelled)

Kakanj Cement Plant is a cement plant in Bosnia and Herzegovina. Its listed capacity is 770,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Heidelberg Materials Cement BiH d.d. Kakanj. By capacity it ranks #1 among 2 cement plants in Bosnia and Herzegovina. It emits about 430,400 t CO₂e a year from Climate TRACE. That is 14% of the CO₂e from the 7 facilities in Bosnia and Herzegovina that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 54% above the national median for this sector.

770,000t of cement
430,400t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Bosnia and Herzegovina
0.56t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437261.

Data status

Known source data

FacilityKakanj Cement Plant Climate TRACE
CountryBosnia and Herzegovina Climate TRACE
Coordinates44.11704, 18.11278 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity770,000 t of cement Climate TRACE
Owner / operatorHeidelberg Materials Cement BiH d.d. Kakanj Climate TRACE
Modelled CO₂e430,400 t/yr Climate TRACE

Calculated from the dataset

Bosnia and Herzegovina rank#2 of 7 · top 28.6% calculated
Global cement rank#1333 of 2113 · top 63.1% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 770,000 t of cement, Kakanj Cement Plant is around the median cement plant in Bosnia and Herzegovina (770,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 430,400 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

2.4krailcars of coal burned
100kgasoline cars driven for a year
430kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 430k t CO₂e/yr (Scope 1), Kakanj Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 430k t at the EU CBAM rate (€75/t) is €32.4M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

430k t CO₂e / yrScope 1 emissions
€32.4M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Capacity vs largest cement plants in Bosnia and Herzegovina

Kakanj Cement Plant: 770,000 t of cement770kKakanj Cem…Lukavac Cement Plant: 700,000 t of cement700kLukavac Ce…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Heidelberg Materials Cement BiH d.d. Kakanj.

Local climate

Kakanj Cement Plant sits in a temperate oceanic climate zone (Köppen Cfb), at 44.1°N in the northern hemisphere.

~11°Ctypical annual mean
~18°Ctypical warm-season
Temperate oceanic: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a mild atmospheric environment (estimated ISO 9223 class C2 — Low), with humidity / wetness the leading environmental stress.

C2ISO 9223 corrosivity (indicative)
27/100environmental-severity index
19.0°Cseasonal temperature swing
171 kmdistance to coast
LowCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1415 W/m² to ambient — roughly 1.09× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #1 largest of 2 cement plants in Bosnia and Herzegovina by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates 44.11704, 18.11278. View on OpenStreetMap.

Frequently asked questions

What type of facility is Kakanj Cement Plant?

Kakanj Cement Plant is a cement plant in Bosnia and Herzegovina. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Kakanj Cement Plant?

The open dataset lists 770,000 t of cement of capacity for Kakanj Cement Plant.

How much CO₂ does Kakanj Cement Plant emit?

The page uses about 430,400 t CO₂e/year from the open dataset It ranks #2 among facilities in Bosnia and Herzegovina by estimated CO₂.

Where is Kakanj Cement Plant located?

Kakanj Cement Plant is in Bosnia and Herzegovina at approximately 44.11704, 18.11278.

Who operates Kakanj Cement Plant?

The operator recorded in the open dataset is Heidelberg Materials Cement BiH d.d. Kakanj.

Built from open public data; no personal information. Operate this site? Request a correction or removal.