Facility counts by sector, Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Across the 7 Bosnia and Herzegovina industrial facilities with an estimated CO₂ figure (Climate TRACE), total emissions are about 3.1 Mt CO₂e/yr. The single largest emitter, Pavgord Zenica steel plant (iron-and-steel), accounts for about 57% of that. The biggest sectoral share comes from iron-and-steel. Among facilities with a known operator, the top three — ArcelorMittal Zenica doo, Heidelberg Materials Cement BiH d.d. Kakanj, Pavgord doo — account for roughly 84%. Most of these facilities sit in a temperate Köppen climate zone.
Estimated CO₂e (modelled): Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0); climate: Köppen-Geiger (WorldClim). CC BY 4.0.
| # | Facility | Type | t CO₂e/yr |
|---|---|---|---|
| 1 | Pavgord Zenica steel plant | Steel Plant | 1,753,494 |
| 2 | Kakanj Cement Plant | Cement Plant | 430,400 |
| 3 | Birac Zvornik Alumina Factory | Aluminium Smelter | 406,922 |
| 4 | Lukavac Cement Plant | Cement Plant | 233,844 |
| 5 | Brod Oil Refinery | Refinery | 191,171 |
| 6 | Sisecam Soda Lukavac d.o.o. | Chemical Plant | 47,175 |
| 7 | Vlasenica Canton | Aluminium Smelter | 21,008 |
Inzonex IndustryAtlas (2026). Industrial CO2 emissions — Bosnia and Herzegovina. Derived from Climate TRACE v6 and Köppen-Geiger/WorldClim (CC BY 4.0). https://inzonex.co.uk/industryatlas/bosnia-and-herzegovina/
Download Bosnia and Herzegovina dataset (CSV) Methodology & sources