Huaxin Tanga Cement Plant — Tanzania
Cement Plant in Tanzania. Approximate location -5.10125, 39.02174.
Cement PlantTanzaniaCO₂ estimate (modelled)
Huaxin Tanga Cement Plant is a cement plant in Tanzania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Huaxin Cement Co Ltd. It emits about 280,264 t CO₂e a year from Climate TRACE. That is 9.2% of the CO₂e from the 6 facilities in Tanzania that have an emissions figure in IndustryAtlas.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897924.
Data status
Known source data
Calculated from the dataset
Not available
Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.
Similar facilities by modelled emissions
- San Antonio Cement Plant · 280,062 t CO₂e/yr · United States
- Illinois LaSalle Cement Plant · 280,531 t CO₂e/yr · United States
- Mindouli Cement Plant · 280,568 t CO₂e/yr · Congo
- Hima Cement Plant · 279,831 t CO₂e/yr · Uganda
- Joliette Cement Plant · 281,008 t CO₂e/yr · Canada
Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.
Operating power plants within 50 km
- Pangani Falls · Hydro · 68 MW · 50 km
PowerAtlas operating assets, ordered by great-circle distance from published coordinates.
In context: how this facility compares
Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.
What 280,264 t CO₂e a year looks like
This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Carbon cost and Scope 1 emissions
At its reported 280k t CO₂e/yr (Scope 1), Huaxin Tanga Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 280k t at the EU CBAM rate (€75/t) is €21.1M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).
Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.
Operator
Operated by Huaxin Cement Co Ltd. All facilities by this operator →
Local climate
Huaxin Tanga Cement Plant sits in a tropical savanna climate zone (Köppen As), at 5.1°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
Site climate & environmental severity
This site sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.
In this site’s local climate, a bare 150 °C surface sheds about 1235 W/m² to ambient — roughly 0.95× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).
Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.
How it compares & nearby sites
Nearby industrial sites
- Tanzania Portland Tanga Cement Plant · Cement Plant · 645,540 t CO₂
- Kenya Petroleum Mombasa Refinery · Refinery
- Bamburi Mombasa Cement Plant · Cement Plant · 441,573 t CO₂
- Devki Steel Mills Kwale plant · Steel Plant · 671,416 t CO₂
- National Kaloleni Cement Plant · Cement Plant · 237,475 t CO₂
- Mkomani Cement Plant · Cement Plant · 611,945 t CO₂
Location
Coordinates -5.10125, 39.02174. View on OpenStreetMap.
Frequently asked questions
What type of facility is Huaxin Tanga Cement Plant?
Huaxin Tanga Cement Plant is a cement plant in Tanzania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.
How much CO₂ does Huaxin Tanga Cement Plant emit?
The page uses about 280,264 t CO₂e/year from the open dataset It ranks #6 among facilities in Tanzania by estimated CO₂.
Where is Huaxin Tanga Cement Plant located?
Huaxin Tanga Cement Plant is in Tanzania at approximately -5.10125, 39.02174.
Who operates Huaxin Tanga Cement Plant?
The operator recorded in the open dataset is Huaxin Cement Co Ltd.