Home / Africa / Congo / Cement plants / Mindouli Cement Plant

Mindouli Cement Plant — Congo

Cement Plant in Congo. Approximate location -4.24236, 14.36285.

Cement PlantCongoCO₂ estimate (modelled)

Mindouli Cement Plant is a cement plant in Congo. Its listed capacity is 700,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Diamond Cement Congo SA. It emits about 280,568 t CO₂e a year from Climate TRACE. That is 46% of the CO₂e from the 4 facilities in Congo that have an emissions figure in IndustryAtlas. Its CO₂ per unit of capacity is 11% above the national median for this sector.

700,000t of cement
280,568t CO₂e / yr (Climate TRACE)
#1CO₂ rank in Congo
0.40t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896551.

Data status

Known source data

FacilityMindouli Cement Plant Climate TRACE
CountryCongo Climate TRACE
Coordinates-4.24236, 14.36285 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity700,000 t of cement Climate TRACE
Owner / operatorDiamond Cement Congo SA Climate TRACE
Modelled CO₂e280,568 t/yr Climate TRACE

Calculated from the dataset

Congo rank#1 of 4 · top 25.0% calculated
Global cement rank#1691 of 2113 · top 80.0% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

In context: how this facility compares

At 700,000 t of cement, Mindouli Cement Plant is around the median cement plant in Congo (700,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations, supplied by boilers, furnaces or direct combustion. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 280,568 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

1.6krailcars of coal burned
58khomes' electricity use for a year
281kacres of US forest absorbing CO₂ for a year

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost and Scope 1 emissions

At its reported 281k t CO₂e/yr (Scope 1), Mindouli Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 281k t at the EU CBAM rate (€75/t) is €21.1M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

281k t CO₂e / yrScope 1 emissions
€21.1M/yrCBAM exposure on EU exports

Carbon price: EU CBAM €75/t · EU ETS €85/t, September 10, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Indicative carbon value, not the cash bill — free allocation applies; not compliance advice.

Operator

Operated by Diamond Cement Congo SA.

Local climate

Mindouli Cement Plant sits in a tropical savanna climate zone (Köppen Aw), at 4.2°S in the southern hemisphere.

~26°Ctypical annual mean
~29°Ctypical warm-season
Tropical savanna: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

This site sits in a moderately corrosive environment (estimated ISO 9223 class C3 — Medium), with humidity / wetness the leading environmental stress.

C3ISO 9223 corrosivity (indicative)
35/100environmental-severity index
4.2°Cseasonal temperature swing
259 kmdistance to coast
ModerateCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1248 W/m² to ambient — roughly 0.96× the loss at a 20 °C reference. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

Nearby industrial sites

Location

Coordinates -4.24236, 14.36285. View on OpenStreetMap.

Frequently asked questions

What type of facility is Mindouli Cement Plant?

Mindouli Cement Plant is a cement plant in Congo. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Mindouli Cement Plant?

The open dataset lists 700,000 t of cement of capacity for Mindouli Cement Plant.

How much CO₂ does Mindouli Cement Plant emit?

The page uses about 280,568 t CO₂e/year from the open dataset It ranks #1 among facilities in Congo by estimated CO₂.

Where is Mindouli Cement Plant located?

Mindouli Cement Plant is in Congo at approximately -4.24236, 14.36285.

Who operates Mindouli Cement Plant?

The operator recorded in the open dataset is Diamond Cement Congo SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.