Home / Africa / Tanzania / Cement plants / Tanzania Portland Tanga Cement Plant

Tanzania Portland Tanga Cement Plant

Cement Plant in Tanzania. Approximate location -5.10796, 38.99662.

Cement PlantTanzaniaCO₂ estimate (modelled)

Tanzania Portland Tanga Cement Plant is a cement plant in Tanzania. Its listed capacity is 1,300,000 t of cement. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length. It is operated by Tanzania Portland Cement PLC. By capacity it ranks #1 among 2 cement plants in Tanzania. It emits about 645,540 t CO₂e a year from Climate TRACE, roughly comparable to the annual emissions of 150k passenger cars. Its CO₂ per unit of capacity is 37% above the national median for this sector.

1,300,000t of cement
645,540t CO₂e / yr (Climate TRACE)
#2CO₂ rank in Tanzania
0.50t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897930.

Data status

Known source data

FacilityTanzania Portland Tanga Cement Plant Climate TRACE
CountryTanzania Climate TRACE
Coordinates-5.10796, 38.99662 Climate TRACE
Sector / subsectorcement Climate TRACE
Reported capacity1,300,000 t of cement Climate TRACE
Owner / operatorTanzania Portland Cement PLC Climate TRACE
Modelled CO₂e645,540 t/yr Climate TRACE

Calculated from the dataset

Tanzania rank#2 of 6 · top 33.3% calculated
Global cement rank#888 of 2113 · top 42.0% calculated
Climate contextderived from coordinates calculated

Not available

Fuel typeNot available not in dataset
Thermal capacity (MW)Not available not in dataset

Source data, measured cross-checks and calculated values are kept separate. No confidence percentage is invented.

Similar facilities by modelled emissions

Same Climate TRACE subsector; closest non-placeholder modelled CO₂e values. Russia and Belarus excluded.

Operating power plants within 50 km

PowerAtlas operating assets, ordered by great-circle distance from published coordinates.

In context: how this facility compares

At 1,300,000 t of cement, Tanzania Portland Tanga Cement Plant is around the median cement plant in Tanzania (1,300,000 t of cement). Subsector: cement. As cement plant, it requires high process heat (typically 800–1400°C) for its core industrial operations — heat that must be supplied by boilers, furnaces or direct combustion, and losses through uninsulated vessels and piping represent wasted fuel. Removable modular insulation can cut those losses by 80–96%, surface-cooling equipment to ≤45°C, with payback often under 2 years. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

Capacity & CO₂-intensity comparison computed from Climate TRACE industrial facilities data; sector role based on engineering reference.

What 645,540 t CO₂e a year looks like

This facility's estimated annual CO₂e (Climate TRACE, modelled) in everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

150kcars driven for a year
84khomes' annual energy use
11 milliontree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Carbon cost, Scope 1 & decarbonization potential

At its reported 646k t CO₂e/yr (Scope 1), Tanzania Portland Tanga Cement Plant carries no domestic carbon price — and as a CBAM-covered product, its 646k t at the EU CBAM rate (€75/t) is €48.6M/yr of exposure on EU-bound exports. CBAM share rises from 2.5% (2026) to 100% by 2034. The fastest decarbonization lever is energy efficiency: eliminating heat loss on hot equipment (removable insulation, steam & waste-heat recovery) typically cuts 2–5% of fuel-related CO₂ — here ≈13k t–32k t/yr, worth €973k€2.4M, with payback up to 2 years. No domestic carbon price — but cement, steel, aluminium, fertilizer and hydrogen exported to the EU face CBAM at €75/t (rising to 100% by 2034).

646k t CO₂e / yrScope 1 emissions
€48.6M/yrCBAM exposure on EU exports
13k t–32k t/yr ≈ €973k€2.4MDecarbonization potential

Carbon price: EU CBAM €75/t · EU ETS €79/t, July 2, 2026, refreshed live via Carbon Hub. CO₂: Climate TRACE. Efficiency range: US DOE / ASTM C680 (method). Indicative carbon value, not the cash bill — free allocation applies; not compliance advice. Estimate the saving for this site →

Capacity vs largest cement plants in Tanzania

Tanzania Portland Tanga Cement Plant: 1,300,000 t of cement1.3MTanzania P…Tanzania Portland Dar Es Salaam Cement Plant: 700,000 t of cement700kTanzania P…

Listed capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Tanzania Portland Cement PLC. All facilities by this operator →

Local climate

Tanzania Portland Tanga Cement Plant sits in a tropical monsoon climate zone (Köppen Am), at 5.1°S in the southern hemisphere.

~26°Ctypical annual mean
~28°Ctypical warm-season
Tropical monsoon: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

Site climate & environmental severity

The local climate sets how fast unprotected steel, protective coatings and the insulation on hot process equipment degrade at this site. It sits in an aggressive, high-corrosion environment (estimated ISO 9223 class C5 — Very high), with marine salt corrosion the leading environmental stress.

C5ISO 9223 corrosivity (indicative)
50/100environmental-severity index
4.4°Cseasonal temperature swing
48 kmdistance to coast
Very highCUI risk tier

In this site’s local climate, a bare 150 °C surface sheds about 1235 W/m² to ambient — roughly 0.95× the loss at a 20 °C reference; removable insulation recovers about 1173 W/m² of that. Reference-surface calculation at a 150 °C surface from WorldClim climate normals (ASTM C680 / ISO 12241) — an indicative per-climate comparison, not a measurement of this site’s specific equipment. Open method dataset: DOI 10.5281/zenodo.20787408 (CC BY 4.0).

Higher environmental severity is exactly where protective removable insulation pays back most: a sheltered micro-climate slows corrosion, UV and thermal-cycling damage and extends outdoor hardware service life. This is an indicative site-climate context — not a condition assessment of any specific plant or operator.

Indicative estimate via the ISO 9223:2012 informative method (atmospheric corrosivity from temperature, time-of-wetness and airborne salinity), using WorldClim climate normals, the Köppen-Geiger class and coast distance. Indicative, not a measured corrosion rate.

How it compares & nearby sites

The #1 largest of 2 cement plants in Tanzania by listed capacity (Climate TRACE).

Nearby industrial sites

Location

Coordinates -5.10796, 38.99662. View on OpenStreetMap.

Heat loss & insulation profile

For a cement plant, the main modular-insulation targets are rotary kiln shell, preheater tower, tertiary air duct & kiln hood, clinker-cooler ducts, valves. Typical hot-surface ranges used for screening: 200–1,000 °C.

60% of cement CO2 is process calcination - NOT insulation-addressable; energy here is the fuel side only.

Indicative recoverable energy

A first-pass insulation screen suggests about 12,000 MWh/year of recoverable heat-loss reduction and about 4,000 t CO₂e/year of avoided emissions. Screening estimate scaled from installed process-heat projects and surface-temperature reduction data.

See Inzonex Modular Insulation → Run the calculator →

Screening calculation from facility class, capacity and open emissions/energy context. Engineering survey required before procurement.

Safety & the no-regret first step

Start with a thermal survey of valves, flanges, doors and bends. Removable modular insulation keeps maintenance access open while lowering exposed-surface temperature and wasted heat.

External climate finance your country can access

For energy-efficiency projects around process heat, likely external funding channels include:

Sources: country climate-finance facilities and public development-bank programmes.

Frequently asked questions

What type of facility is Tanzania Portland Tanga Cement Plant?

Tanzania Portland Tanga Cement Plant is a cement plant in Tanzania. Cement plants heat limestone to 1,400°C in rotary kilns — one of the hottest industrial processes — and must control temperature precisely across the entire kiln length.

What capacity is listed for Tanzania Portland Tanga Cement Plant?

The open dataset lists 1,300,000 t of cement of capacity for Tanzania Portland Tanga Cement Plant.

How much CO₂ does Tanzania Portland Tanga Cement Plant emit?

The page uses about 645,540 t CO₂e/year from the open dataset It ranks #2 among facilities in Tanzania by estimated CO₂.

Where is Tanzania Portland Tanga Cement Plant located?

Tanzania Portland Tanga Cement Plant is in Tanzania at approximately -5.10796, 38.99662.

Who operates Tanzania Portland Tanga Cement Plant?

The operator recorded in the open dataset is Tanzania Portland Cement PLC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.